Unlock instant, AI-driven research and patent intelligence for your innovation.

BIM-based building construction management equipment

A technology for managing equipment and building construction. It is applied to mechanical equipment, chassis/cabinet/drawer parts, and sealed enclosures. It can solve problems such as the inability to freely adjust the pitch angle of the display screen, unfavorable device safety, and affecting user viewing. , to achieve the effect of improving flexibility and practicability, facilitating safety and use, and saving labor intensity

Inactive Publication Date: 2020-07-10
QINGDAO XINHUAYOU CONSTR GROUP
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The patent No. CN208204444U is a BIM-based building construction management equipment, including a mounting base, a monitoring tester and a data display screen. The mounting base includes an adjustment box and a lifting box that are set up and down in sequence; While the data display is stable, it can also easily adjust the use angle of the data display on the mounting base, which has better applicability; the lifting box set on the mounting base can adjust the height of the mounting base at will according to the user's needs, to meet different heights. The user uses it, but when the device is in use, the display screen and the tester at the top of the device are fixed on the outside of the top of the device, which is not only not conducive to the safety of the device, but also easy to accumulate dust over time, which is not conducive to the safety of the device. At the same time, the pitch angle of the display screen cannot be adjusted freely. When used outdoors, the light exposure will affect the user's viewing

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM-based building construction management equipment
  • BIM-based building construction management equipment
  • BIM-based building construction management equipment

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0029] Embodiment one, such as Figure 1-4 As shown, a BIM-based building construction management device according to an embodiment of the present invention includes a base 1, a fixed box 2, a workbench 3, a display screen 4, a tester 5 and a receiver 6, and the BIM measurement processing terminal is connected to receive The receiver 6 and the display screen 4, the receiver 6 is used to receive the construction details of the satellite remote sensing, the BIM measurement processing end monitors the construction details of the structure of the receiver 6 in real time, and the display screen 4 displays the BIM measurement processing end Supervision data is displayed, the top of the base 1 is fixed with the fixed box 2, the inner sides of the fixed box 2 are provided with chute 7, and the inner bottom of the fixed box 2 is fixed with a motor One 8, the output shaft of the motor one 8 is connected with the rotating shaft one 9, and the two sides of the rotating shaft one 9 are res...

Embodiment 2

[0030] Embodiment two, such as Figure 4 As shown, the two sides of the bottom end of the workbench 3 are fixed to the top two sides of the holder 18 by the elastic column 32; the elastic column 32 can support the workbench 3, and can simultaneously The rotation angle of the workbench 3 is limited on the side.

Embodiment 3

[0031] Embodiment three, such as image 3 As shown, the side of the sliding sleeve 16 close to the chute 7 is fixed with a sled column 33 that is compatible with the chute 7; friction between.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses BIM-based building construction management equipment. The BIM-based building construction management equipment comprises a base, a fixed box, a workbench, a display screen, a tester and a receiver, wherein the fixed box is fixed to the top end of the base; sliding grooves are formed in the two side edges of the interior of the fixed box; a first motor is fixed to one side edge of the bottom end of the interior of the fixed box; an output shaft of the first motor is connected with a first rotating shaft; a first bevel gear and a second bevel gear are fixed to the two sides of the first rotating shaft respectively; third bevel gears matched with the first bevel gear and the second bevel gear are fixed to the top ends of the first bevel gear and the second bevel gear respectively; connecting shafts are fixed to the top ends of the third bevel gears respectively; the outer sides of the bottoms of the connecting shafts are provided with fixed cylinders matched with the connecting shafts in a sleeving mode; a partition plate is fixed to the top ends of the fixed cylinders and fixed into the fixed box; the top ends of the connecting shafts penetrate through the partition plate and extend to the position above the partition plate; a threaded structure is fixed to the outer side of each connecting shaft located above the partition plate; and the outer side of thetop of each connecting shaft is provided with a sliding sleeve matched with the corresponding threaded structure in the sleeving mode.

Description

technical field [0001] The present invention relates to the technical field of building construction, in particular to a BIM-based building construction management equipment. Background technique [0002] BIM, also known as building information model or building information management or building information manufacturing, is based on various information data of construction projects, simulates the real information of buildings through digital information simulation, and realizes engineering through three-dimensional building models. Supervision, property management, equipment management, digital processing, engineering management and other functions. Conducive to project visualization and refined construction, it is an important tool to realize refined and information-based management in the construction industry. [0003] The patent No. CN208204444U is a BIM-based building construction management equipment, including a mounting base, a monitoring tester and a data display...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): F16M11/32F16M11/42F16M11/18F16M11/04F16M11/10H05K5/03H05K5/06
CPCF16M11/32F16M11/42F16M11/18F16M11/046F16M11/10H05K5/03H05K5/06
Inventor 于忠福
Owner QINGDAO XINHUAYOU CONSTR GROUP