A technology for strengthening structure and filling in the access route, which is applied in the fields of backfill, safety device, earthwork drilling and mining, etc., can solve the problems of reducing the comprehensive mining cost of the mining method by filling the access route, the safety risk of steel bar/wire cutting, and the high labor cost. Achieve the effect of improving the comprehensive production capacity of the road, reducing the construction safety risks of workers, and reducing the labor volume and labor cost.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment
[0120] The annual output of a large underground metal mine is about 2 million t / a, and the ore is of good grade and high value. The main ore body is about 1000m long along the strike, about 800m long in the dip, and about 600m vertically, with a large ore body distribution. The overall thickness of the ore body is about 20-200m, with an average thickness of about 100m. The ore body is inclined to steeply inclined, with a dip angle of about 60-80°.
[0121] The geological structure of the mining area is strong, the joints and fissures of the rock mass are developed, and the engineering geological conditions are complex. The surrounding rocks of the ore body and the upper and lower walls are mainly of fractured rock mass structure, and the MRMR value of the rock mass quality evaluation index is mainly around 30-40, and the rock mass quality is generally to poor.
[0122] According to the occurrence state of the ore body, the quality of the rock mass and its mining technical co...