Staged fracturing and production increasing revamping method for well cementation and completion shaft of three and a half inches of sidetrack horizontal well
A technology of sidetracking horizontal wells and staged fracturing, which is applied in wellbore/well components, chemical instruments and methods, earthwork drilling and production, etc. It can solve problems such as high risk of pipe sticking, uncontrollable fractures, and high safety risks. To achieve the effects of ensuring oil recovery operations, ensuring safe construction, and improving utilization
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0030] In order to solve the existing problems of high pipe sticking risk, high safety risk, and uncontrollable fractures, the present invention provides a method for staged fracturing stimulation of a sidetracked horizontal well with a 3-inch semi-solid completion wellbore. This method realizes the precise initiation and effective extension of each fracture, improves the utilization rate of the horizontal section, and achieves the purpose of controlling water and increasing oil production.
[0031] A method for staged fracturing stimulation of a sidetracked horizontal well with a 3-inch half-solid completion wellbore, the specific steps of which are as follows:
[0032] S1, perform perforation, acid treatment and temporary plugging and fracturing in the first section;
[0033] S2, running the bridge plug to seal the first perforation section;
[0034] S3, performing perforation, acid treatment and temporary plugging and fracturing in the second section;
[0035] S4, washing...
Embodiment 2
[0042] Based on Example 1, in this example, preferably, in the step S1, the perforation is carried out through oil pipe transmission, the phase of the perforating gun is 90°, the diameter of the perforating gun is 54 mm or 60 mm, and the hole density is 16 Holes / m, the perforation section is 1-2 meters long.
[0043] Preferably, in the step S1, the acid treatment step is: sequentially inject acid liquid and barite plugging solution with a weight ratio of 1:1 from the fracturing string to clean the perforated blast hole and close the The mud polluted zone in the well zone is used for plugging removal. The amount of acid liquid is injected into 3-5m³ per meter according to the thickness of the oil layer, and the displacement is 0.2-0.5m 3 / min, shut down the well for at least 45 minutes after acid treatment.
[0044] Preferably, the acid solution includes earth acid and cellulose plugging remover in a weight ratio of 10:1; the concentration of the barite plugging remover soluti...
PUM
Property | Measurement | Unit |
---|---|---|
Diameter | aaaaa | aaaaa |
Diameter | aaaaa | aaaaa |
Density | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com