Construction method for accurately mounting annular foundation reinforcement cage of rotary hearth furnace

A steel skeleton and precise installation technology, applied in the processing of building materials, construction, building structure, etc., can solve the safety risk, time-consuming and labor-intensive, and operation efficiency that the roundness, spacing and protective layer thickness of basic steel bars cannot be accurately controlled. Low problems, to achieve the effect of improving work efficiency, reducing the frequency of use, and being easy to operate

Inactive Publication Date: 2021-02-05
SHANGHAI ERSHIYE CONSTR CO LTD +1
View PDF7 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0010] The present invention aims to overcome the defects of the prior art, and provides a construction method for the precise installation of the steel bar skeleton of the circular foundation of the rotary hearth furnace, which overcomes the frequent use of hoisting machinery for steel bar handling and protective layer thickness adjustment in the traditional steel bar installation process; Binding, time-consuming and labor-intensive, low work efficiency, inability to accurately control the roundness, spacing, and thickness of the protective layer of the foundation steel bars, and the existence of safety risk defects, etc., provide a rotary hearth furnace that is easy to operate, has a high safety factor, and can achieve precise control Precise Installation and Construction Method of Reinforcement Skeleton of Large-diameter Circular Concrete Foundation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for accurately mounting annular foundation reinforcement cage of rotary hearth furnace
  • Construction method for accurately mounting annular foundation reinforcement cage of rotary hearth furnace

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] Such as figure 1 , 2 Shown: A construction method for the accurate installation of the steel skeleton of the circular foundation of the rotary hearth furnace, including the following steps:

[0033] Step 1. Construction preparation: including completing the construction of the circular foundation cushion of the rotary hearth furnace, and carrying out measurement and setting-out;

[0034] Step 2, making the main reinforcement and stirrup of the steel skeleton: use the steel bar cutting machine, straightening machine, and bending machine to complete the production of the main reinforcement and stirrup of the circular foundation steel bar;

[0035] Step 3. Manufacture of steel bar spacing control calipers: According to the design drawing steel bar spacing and protection thickness control requirements, use the waste steel on site to make control rulers;

[0036] Step 4. Set up the steel support frame and position it: the support frame includes sweeping rod 1, horizontal r...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction method for accurately mounting an annular foundation reinforcement cage of a rotary hearth furnace. The construction method comprises the steps that 1, construction preparation is conducted; 2, main reinforcements and stirrups of the reinforcement cage are manufactured; 3, a steel bar spacing control caliper is manufactured; 4, a steel bar supporting frame is erected and positioning is conducted; 5, the spacing control caliper is fixed on the supporting frame; 6, steel bars are hoisted and placed on the supporting frame to be bound and mounted; 7, the distance and the protection layer thickness are checked; 8, the supporting frame is dismounted; 9, the position, the distance and the protection layer thickness are rechecked; and 10, construction of the next procedure is conducted. The construction method is safe and reliable, the reinforcement cage is made of universal steel on a construction site, the structure is simple, manufacturing is convenient, and good popularization value is achieved.

Description

technical field [0001] The invention relates to the technical field of steel bar positioning and installation for building construction, in particular to a construction method for precise installation of a circular foundation steel bar skeleton of a rotary hearth furnace. Background technique [0002] With the increasingly stringent national requirements on environmental protection and energy consumption, environmental protection and energy-saving transformation of the iron and steel industry has become a mainstream trend. The current iron and steel production process will produce a large amount of metal dust and sludge containing iron and zinc, and the comprehensive utilization rate of resources is low. Harm the living environment, seriously affect the safety and economic benefits of enterprises, and the rotary hearth furnace treatment technology is currently the most advanced metallurgical metal-containing dust sludge treatment technology in the world. Due to the short redu...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04G21/12
CPCE04G21/12E04G21/122E04G21/123
Inventor 王新鑫郭潘王媛媛兰正林张捷