Preparation process and paving method of normal-temperature asphalt capable of forming high-porosity and high-modulus asphalt
A normal temperature asphalt and preparation technology, applied in ceramic products, other household appliances, climate sustainability, etc., to achieve high strength, high adhesion, flexible and fast construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0042] Embodiment 1: Non-ionic modified polyurethane thickener is not used
[0043] 1) According to the oil-stone ratio of 4.0% (without water), add the weighed wear-resistant room temperature asphalt composite emulsion without any non-ionic modified polyurethane thickener and OGFC speed-strength mixing aggregate into the cement forced mixer, and Stir for 5 minutes, after the material is evenly stirred, open the material door to discharge;
[0044] 2) Use a tamping machine to directly tamp the mixture discharged from the cement forced mixer. The area of the surface layer is about 2 square meters, and the thickness is about 6 cm. A week later, the core was sampled, and the porosity was measured to be 13.2%, and the Marshall stability was 5.9kN.
Embodiment 2
[0045] Embodiment 2: No FLL fast curing agent is used
[0046] 1) According to the asphalt ratio of 4.0% (without water), the weighed wear-resistant normal temperature asphalt composite emulsion with 0.3%wt of non-ionic modified polyurethane thickener added, OGFC speed-strength mixing set without FLL fast curing agent Add the material into the cement forced mixer and stir together for 5 minutes. After the material is evenly stirred, open the material door to discharge the material;
[0047] 2) Use a tamping machine to directly tamp the mixture discharged from the cement forced mixer. The surface area is about 2 square meters and the thickness is about 6 cm. After a week, the core is sampled. At this time, the porosity is 25.1%, and the Marshall is stable. The degree is 3.3kN.
Embodiment 3
[0048] Embodiment three: Both non-ionic modified polyurethane thickener and FLL fast curing agent are used
[0049] 1) According to the asphalt ratio of 4.0% (without water), the weighed wear-resistant room temperature asphalt composite emulsion and OGFC speed-strength mixed aggregate (adding 18% wt FLL fast curing agent), add to the cement forced mixer, stir together for 5 minutes, after the material is evenly stirred, open the material door to discharge;
[0050] 2) Use a tamping machine to directly tamp the mixture discharged from the cement forced mixer. The area of the surface layer is about 2 square meters, and the thickness is about 6 cm. A week later, the core was sampled. At this time, the porosity was measured to be 26.7%, and the Marshall stability was 8.6kN.
[0051] Obviously, among the three embodiments, the specific embodiment three: not only adopts the non-ionic modified polyurethane thickener, but also uses the normal temperature asphalt with high porosity ...
PUM
Property | Measurement | Unit |
---|---|---|
stability | aaaaa | aaaaa |
stability | aaaaa | aaaaa |
stability | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com