Offshore oilfield safe long-acting water injection tubular pile and construction method
A technology for offshore oil fields and pipe strings, which is applied in the field of safe long-term water injection pipe strings and construction in offshore oil fields. The effect of layer water injection, improving operation effect and saving production cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0137] see Figure 1 to Figure 7 , the present invention provides a technical solution: a safe long-term water injection string for offshore oilfields, comprising:
[0138] A sand control pipe string and a water injection pipe string, the water injection pipe string is arranged inside the sand control pipe string;
[0139] The sand control pipe string includes at least two sand filter pipes 10 respectively corresponding to different oil layers arranged at intervals on the casing 6 from top to bottom. Y341 packers 12 are set under the lower sand filter pipes, and the Y341 packers are set on the casing and sealed on the inner wall of the wellbore;
[0140] The water injection string includes at least two adjustable water dispensers 9 respectively corresponding to different oil layers arranged at intervals on the oil pipe 5 from top to bottom, and a setting switch 11 is connected to the bottom of each adjustable water dispenser. A hydraulic control layered packer 13 is arranged...
Embodiment 2
[0270] see Figure 1 to Figure 7 , the present invention provides a technical solution: a safe long-term water injection string for offshore oilfields, comprising:
[0271] A sand control pipe string and a water injection pipe string, the water injection pipe string is arranged inside the sand control pipe string;
[0272] The sand control pipe string includes at least two sand filter pipes 10 respectively corresponding to different oil layers arranged at intervals on the casing 6 from top to bottom. Y341 packers 12 are set under the lower sand filter pipes, and the Y341 packers are set on the casing and sealed on the inner wall of the wellbore;
[0273] The water injection string includes at least two adjustable water dispensers 9 respectively corresponding to different oil layers arranged at intervals on the oil pipe 5 from top to bottom, and a setting switch 11 is connected to the bottom of each adjustable water dispenser. A hydraulic control layered packer 13 is arranged...
Embodiment 3
[0363] see Figure 1 to Figure 7 , the present invention provides a technical solution: a safe long-term water injection string for offshore oilfields, comprising:
[0364] A sand control pipe string and a water injection pipe string, the water injection pipe string is arranged inside the sand control pipe string;
[0365] The sand control pipe string includes at least two sand filter pipes 10 respectively corresponding to different oil layers arranged at intervals on the casing 6 from top to bottom. Y341 packers 12 are set under the lower sand filter pipes, and the Y341 packers are set on the casing and sealed on the inner wall of the wellbore;
[0366] The water injection string includes at least two adjustable water dispensers 9 respectively corresponding to different oil layers arranged at intervals on the oil pipe 5 from top to bottom, and a setting switch 11 is connected to the bottom of each adjustable water dispenser. A hydraulic control layered packer 13 is arranged a...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Tensile strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


