Construction process for highway bridge pile foundation to pass through oversized and multi-layer karst cave
A highway and construction technology technology, applied in bridges, bridge construction, infrastructure engineering, etc., can solve the problems of economic loss, long construction period of pile foundation, stuck drill, etc. The effect of drilling
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] The embodiment of this application discloses the construction technology of expressway bridge pile foundation passing through super large and multi-layer karst caves. Specifically, Yiyi Expressway is taken as an example. Limestone, argillaceous limestone, dolomitic limestone, and marl in the Sichuan-Yunnan boundary on the south side of Guoquanyan, Haoba Town, Lianxian County. The bridge of this project adopts pile foundation, and some pile foundations need to go through the karst cave. refer to figure 1 , the construction process includes the following steps:
[0040] Step 1. Advanced detection:
[0041]Due to the complex stratum structure in karst areas, the development of fissures, and the frequent changes in the location, size, and depth of karst caves, it is difficult to fully investigate the actual karst conditions in the survey and design stage of geological surveys in karst areas, and the survey misjudgment rate is high. Therefore, during the construction proce...
Embodiment 2
[0058] The embodiment of the present application discloses the construction technology of expressway bridge pile foundation passing through super large and multi-layer karst caves. The difference from embodiment 1 is that the construction method in step 2 also includes:
[0059] Spinning pile reinforcement method: Aiming at the collapse of silt layer and round gravel layer, the rotary grouting pile reinforcement scheme is adopted, and the pile points are detected and recorded according to the Rayleigh wave. The vertical and horizontal distance between adjacent pile points is 2m-3m. The alignment of the high-pressure rotary grouting pile machine is adjusted to guide the hole. The drill pipe rotates and drills to 2m below the silt layer and the round gravel layer, then stops, starts to spray grout and rotates and lifts at the same time, and the lifting speed is controlled at 10cm / min-20cm / min. The rotation speed is controlled at 15r / min-20r / min. After the slurry surface no longer...
PUM
Property | Measurement | Unit |
---|---|---|
Length | aaaaa | aaaaa |
Length | aaaaa | aaaaa |
Length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com