Power distribution network relay protection vector check and action logic verification test device and method
A relay protection and action logic technology, applied in emergency protection circuit devices, electrical components, fault locations, etc., can solve the problems of small transformer capacity, short distribution network line distance, and inability to meet relay protection vector inspection, etc. The effect of eliminating hidden dangers, improving accuracy and good adaptability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0063] A relay protection vector check and action logic check method before the distribution network is put into operation, including the method steps when performing a bus crossing short circuit test, to check bus differential protection, incoming and outgoing line current differential protection, and backup with direction Protection vector. Method steps when carrying out a transmission line crossing short circuit test for checking busbar protection, current differential protection on both sides and vectors with directional back-up protection. In the method step when carrying out the distribution transformer through-circuit short-circuit test, the vectors of the bus differential protection and the distribution transformer protection can be checked. The method steps when performing the simulated line fault test are used to check the logic of fault protection in the zone, the correct action of self-healing, and the logic of non-maloperation of the fault protection outside the z...
Embodiment 2
[0072] a. When the equipment to be tested is the busbar in the station, connect the inductive analog load, adjust the analog load to 1Ω, adjust the output current and output voltage of the converter equipment, and perform busbar protection, line current differential protection, and line direction overcurrent protection. Vector inspection, as well as the vector inspection of secondary equipment such as related measuring instruments, metering meters, wave recording, control systems, etc., it is necessary to pay attention to the fact that the voltage and current are basically orthogonal in phase, and the phase angle of the voltage is 90° ahead of the current. Judge the correctness of the vector of secondary equipment such as relay protection according to the conventional vector judgment standard.
[0073] When the primary rated current of the current transformer is greater than 1000A, adjust the output current and voltage of the converter equipment to be greater than 20A and 20V (...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com