Maintenance interval evaluation method for aircraft structure damage
A technology for aircraft structure and maintenance interval, applied in the field of performance analysis, can solve the problems affecting the aircraft integrity rate and the maintenance workload of maintenance, etc., and achieve the effect of improving the aircraft integrity rate, reducing the maintenance workload, and saving maintenance costs.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] The embodiment of the present invention provides a maintenance interval assessment method for aircraft structural damage, such as figure 1 shown, including:
[0045] Step S10, setting initial Monte Carlo simulation conditions; the initial simulation conditions include aircraft fleet size, initial use time of each aircraft, aircraft structural maintenance period and aircraft structural failure probability distribution function.
[0046] In this embodiment, the initial simulation conditions are set: the size of the aircraft fleet is n; the initial use time of the i-th aircraft in the fleet is t si , aircraft structure maintenance period T, aircraft structure failure probability distribution function F(t).
[0047] Step S20, compare the initial usage time with the randomly generated failure time.
[0048] In this embodiment, structural damage risk simulation is performed on the i-th aircraft in the fleet. The structural failure probability distribution function F(t) obe...
Embodiment 2
[0076] There are a total of 24 aircraft of a certain type in an airport. Due to the tight development time of this type of aircraft, the fatigue load test of the airframe structure was not carried out in the early stage of development, resulting in frequent structural damage to the current fleet. In order to accurately assess the risk of structural damage to the fleet and formulate a reasonable maintenance interval, this paper takes the fleet as an example and combines the historical structural damage data of the fleet to carry out a risk analysis to verify the risk assessment of the maintenance interval for aircraft structural damage proposed in this paper. method.
[0077] According to the airframe structure crack records found in the maintenance inspection of the aircraft group in recent years, it is found that the structural cracks of the aircraft group are mainly concentrated on the wing structure, so the wing structure is selected as the risk assessment object of this pap...