A technology for differential settlement and structural workshops, which is applied in basic structure engineering, soil protection, construction, etc. It can solve the problems of differential foundation settlement, main structure damage, and large fill thickness, etc., and achieve small post-construction settlement and compression modulus Large, the effect of settlement control
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 2
[0033] A construction method for differential settlement control of a bent frame structure workshop in an excavation and filling area;
[0034] The construction method includes:
[0035] S1: site leveling;
[0036] S2: The site is layered and compacted
[0037] The layer thickness is 6000-8000mm, and the site fill is subjected to dynamic compaction with two point compactions and one full compaction;
[0038] S3: Construction of dynamic compaction punching and compacted gravel pier
[0039] In the filling area and the bearing platform area of the surrounding frame structure of the site, the crushed stone piers are compacted by punching with dynamic ramming. ;
[0040] S4: Construction of gravel cushion structure in excavation area
[0041] For the excavation area, use 700-900mm thick gravel cushion;
[0042] S5: Rotary excavation of bored cast-in-place piles at the junction area of fill and slope.
[0043] The S3 impact hole forming: arrange a gravel pier under each ...
Embodiment 3
[0049] The construction method of differential settlement control of the bent frame structure workshop of the construction project of the aluminum alloy formwork production base in Anning Industrial Park (1.5 million square meters);
[0050] Project Overview
[0051] The proposed site is located in Maming'an Village, Caopu Town, Anning City, Kunming City. The proposed site is Longning Road on the north side, Ming'an Road on the east side, and Longshu Road on the west side. All three roads are newly built municipal asphalt roads in the park. , the south side of the site is now open space, and later is the planned land for other projects. Most of the site is sloping, and some parts have been preliminarily leveled.
[0052] The overall terrain of the site is high in the northwest and low in the southeast. Some areas of the site have been excavated, filled and leveled. The top of the original hill on the northwest side has been excavated about 15.0m, while the original low-lying ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Diameter | aaaaa | aaaaa |
| Diameter | aaaaa | aaaaa |
| Length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 