Method for preventing mine from generating acid waste water
A technology for acid wastewater and mines, which is applied in the field of mine environmental protection to achieve the effect of preventing erosion, low construction and maintenance costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 2
[0011] Embodiment two adopts the cement slurry that concentration is 5-80% to carry out saturated spraying to the ore body that contains sulfide, ore heap, waste rock heap, mining operation face and bare slope: when the ore body that is sprayed, ore When there is leakage of cement slurry at the bottom of piles, waste rock piles, exposed slopes, and mining operation surfaces, stop spraying for more than 3 days, which is a cycle, generally for 1 or more cycles, until The cement slurry covers the entire ore body, ore heap, waste rock heap, exposed slope, and the surface of the mining operation face, so that it can no longer seep any water. In order to achieve better results, waterproof materials such as composite plastic films can also be laid, and then sprayed with clean water, maintained, and finally the vegetation can be restored. Subsequent steps are the same as in Embodiment 1, and will not be described in detail here.
Embodiment 3
[0012] Embodiment 3 First use clarified saturated lime emulsion to carry out saturated spraying on the surroundings of sulfide-containing ore bodies, ore heaps, waste rock heaps, exposed slopes, mining operation faces and mining roadways: the time of each spraying It is 1-30 days, and then stops for 1-10 days. It is a cycle, and generally 1 or more cycles should be carried out; the second step uses lime emulsion with a concentration of 0.08-60% to treat sulfide-containing ore bodies and ores. Saturated spraying around heaps, waste rock piles, exposed slopes, mining operation faces and mining roadways: the time of each spraying is 1-10 days, and then stop for 1-15 days, which is a cycle, and generally should be carried out 1 or more than 1 cycle; then use cement slurry with a concentration of 5-80% to perform saturated spraying on sulfide-containing ore bodies, ore heaps, waste rock heaps, mining operations and exposed slopes: when the sprayed When there is leakage of cement sl...