A pile-forming and building-building technology, which is applied in construction, sheet pile walls, foundation structure tests, etc., can solve problems such as narrow use range, inability to expand the bottom and build piles, potential safety hazards for construction personnel, and difficulty in controlling the quality of piles, etc., to achieve The effect of ensuring the quality of pile foundation engineering, reducing hidden dangers of accidents, and shortening the construction period

Inactive Publication Date: 2007-06-06
周亚萍
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] 1. Part of the soil body of the pile is excavated manually, the construction surface is too large, the workload of soil extraction is obviously increased, and the efficiency is low
[0004] 2. Since there is no immersed tube as support for the bottom expansion equipment, the positioning is not accurate, the expansion angle of the base is too small, and the parameters in the bottom expansion process cannot be guaranteed, so that the quality of the pile is not easy to control, and it is difficult to meet the design requirements, resulting in a single pile The bearing capacity is greatly reduced
[0005] 3. There are potential safety hazards for construction personnel, and construction personnel are prone to accidents if they do not pay attention
[0006] 4. The scope of use is narrow and cannot be used for bottom expansion and pile formation in prefabricated piles and highly complex geological conditions

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0012] The building pile forming method of the present invention comprises the following steps: pressing the first section of the immersed tube with the metal pile head into the soil body, screwing the second section of the immersed tube to the upper end of the first section of the immersed tube, and then placing the immersed tube The pipe is pressed to the hard soil layer at the design level; the metal pile head is taken out, and emulsified oil or ammonium antimony explosive is put in from the sinking pipe mouth, every 0.5m 3 The dosage is 1-5 kg. After the explosive is detonated, the mouth of the immersed tube is sealed. After the explosion of the explosive is completed, the article that seals the mouth of the immersed tube is opened; the residual soil after the explosion is taken out manually; The bottom equipment is used for excavation and bottom expansion construction, the bottom is first expanded vertically and then horizontally, and the bottom is expanded until the cavit...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The present invention discloses a building pile foundation engineering and construction method, in particular, it relates to a building pile-forming method of pipe-sinking belled pile. Said method includes the following steps: pressing the sinking pipe with metal pile head to the hard soil layer with designed level; taking out the metal pile head; utilizing belling equipment to enlarge base; borrowing; using camera to record image formation; placing radial steel bars into the base hollow cavity and railing said radial steel bars into hard soil, pouring the prepared concrete into the base hollow cavity to form a concrete base; downwards placing prefabricated reinforced concrete pile body and making said prefabricated reinforced concrete pile body and cast-in-situ concrete base be butt-connected and anchored into one body; drawing out said sinking pipe so as to form the invented building pile.

Description

technical field [0001] The invention relates to a building pile foundation engineering and construction technology, in particular to a building pile forming method of sinking tube expanding bottom piles. Background technique [0002] It is well known that the quality of building foundation works plays a vital role in the influence of building quality, so each construction unit not only pays attention to the construction quality of above-ground buildings, but also pays more attention to the quality of foundation works. In order to improve the bearing capacity of single piles, expanded bottom piles and composite foundation piles have appeared one after another. Although this has significantly improved the bearing capacity of single piles compared with traditional foundation piles, because the traditional pile foundation engineering construction method is manually Excavate the soil, take the soil and dig the pile body soil, and then dig down a certain depth to prevent the colla...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/50E02D5/44E02D33/00
Inventor 周亚萍吴伟林
Owner 周亚萍
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products