Shallow water level double salt-affected soil raw soil planting and greening method
A soil and water level technology, applied in forestry and horticulture, can solve the problems of short duration of greening landscape, secondary damage of good soil resources, poor drainage and salt discharge effect, etc., to overcome erosion, improve soil structure, and ensure durability Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0035] Take a low-lying land close to the Bohai Sea area with an altitude of 1.3 meters, a saline-alkali land with a groundwater level of 0-0.6m and a large amount of water in the rainy season, and a saline-alkali land with a soil salt content of 6.2‰, where the arbor green plant-white wax is cultivated as an example. If the green area is 2,000 square meters, compare with the existing technique of replacing guest soil with 1,000 square meters. Adopt technical implementation scheme of the present invention as follows:
[0036] 1. Excavate the original soil layer: excavate the original soil layer (1) in the planned greening area to a depth of 150cm;
[0037] 2. Laying water-proof layer: Lay 0.2mm polyvinyl chloride film around and at the bottom to form a water-proof layer (7);
[0038] 3. Laying of salt water drainage pipes: according to the location and direction of the green area, lay PVC palm seepage pipes with a spacing of 5m, a diameter of 20cm, and a length of 600cm as th...
Embodiment 2
[0047] A 4,000-square-meter greening test project in another area near the Bohai Sea. The area is a low-lying land with an altitude of 1.7 meters. The groundwater level in the rainy season is 0.3m-0.6m and the water volume is large. The saline-alkali land with a soil salt content of 6.5‰ cultivates green plants ——Ligustrum lucidum, holly, wherein the new technology of the present invention is applied to 3000 square meters, compared with the existing technology of replacing foreign soil to 1000 square meters.
[0048] Adopt technical scheme of the present invention to implement according to the following steps:
[0049] 1. Excavate the original soil layer: excavate the original soil layer in the planned greening area to 100cm;
[0050] 2. Laying water-proof layer: 0.3mm polyvinyl chloride film is used to lay water-proof layer around and at the bottom;
[0051] 3. Laying of salt water drainage pipes: According to the location and direction of the green area, lay PVC palm seepag...
PUM
Property | Measurement | Unit |
---|---|---|
Diameter | aaaaa | aaaaa |
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com