Steel HG785D for tower crane and production method

A technology of tower cranes and production methods, which is applied to the improvement of process efficiency, etc., and can solve the problems of increased thickness of extra-thick steel plates, inability to guarantee the strength and toughness of extra-thick steel plates and uniformity of thickness direction performance, and reduced cooling speed.

Active Publication Date: 2013-12-25
NANYANG HANYE SPECIAL STEEL CO LTD
View PDF1 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In general, the maximum thickness of HG785D extra-thick steel and its similar products is mostly 150mm. When producing HG785D extra-thick steel larger than 150mm, the main issues that need to be considered: ①The thickness of the extra-thick plate increases, and the cooling rate decreases greatly. Toughness and performance uniformity in the thickness direction cannot be guaranteed, and a suitable co

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Steel HG785D for tower crane and production method
  • Steel HG785D for tower crane and production method
  • Steel HG785D for tower crane and production method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0035] The present embodiment takes the production of 240mm thick HG785D steel as an example, and according to the above-mentioned production method, the main production process parameters of the present embodiment are determined as follows:

[0036] During converter smelting, 10Kg of lime, 8Kg of ferromanganese alloy, and 0.6Kg of ferrosilicon alloy are added to each ton of ladle; LF furnace refining is heated for 9 minutes for the first time and 10 minutes for the second time, and the steel loading temperature is 1600°C; Start pouring afterward; the pouring time for the ingot body is 18 minutes, the pouring time for the cap is 7 minutes, the holding temperature is 450°C, and the wide side of the ingot is extruded for 20 mm in the later stage of solidification; the overall cooling and solidification time for the ingot is 5 hours, and the air gap between the ingot mold and the ingot is controlled to 14 mm; heat treatment In the process, 250Kg / t of industrial salt is added to th...

Embodiment 2

[0038] Present embodiment is on the basis of embodiment 1, and processing parameter is adjusted as follows:

[0039] During converter smelting, 10Kg of lime, 9Kg of ferromanganese alloy, and 0.6Kg of ferrosilicon alloy are added to each ton of ladle; the LF furnace refining is heated for 11 minutes for the first time and 9 minutes for the second time, and the steel loading temperature is 1610°C; After pouring, the pouring time of the steel ingot body is 19 minutes, the pouring time of the cap mouth is 8 minutes, and the cooling and solidification time of the overall steel ingot is 5.5 hours; in the heat treatment process, the quenching temperature is 935 ° C, the holding time is 2.4 min / mm, the tempering temperature is 650 ° C, the holding time 4.4min / mm.

Embodiment 3

[0041] Present embodiment is on the basis of embodiment 1, and processing parameter is adjusted as follows:

[0042] During converter smelting, 10Kg of lime, 10Kg of ferromanganese alloy, and 0.6Kg of ferrosilicon alloy are added to each ton of ladle; the LF furnace refining is heated for 12 minutes for the first time and 8 minutes for the second time, and the steel loading temperature is 1620°C; the pouring temperature is controlled at 1558°C, and the molten steel arrives at the station After pouring, the pouring time of the steel ingot body is 20 minutes, the pouring time of the cap mouth is 9 minutes, and the cooling and solidification time of the overall steel ingot is 6 hours; in the heat treatment process, the quenching temperature is 940 ° C, the holding time is 2.5 min / mm, the tempering temperature is 660 ° C, and the holding time is 4.5 min / mm.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Yield strengthaaaaaaaaaa
Tensile strengthaaaaaaaaaa
Longitudinal impact workaaaaaaaaaa
Login to view more

Abstract

The invention discloses steel HG785D for a tower crane and a production method. The steel HG785D for the tower crane comprises the following components of, by weight, 0.14-0.17% of C, 0.38-0.42% of Si, 1.29-1.43% of Mn, less than or equal to 0.012% of P, less than or equal to 0.003% of S, 0.11-0.15% of Nb+V+Ti, 1.17-1.24% of Cr and 1.63-1.78% of Ni. The thickness of the steel HG785D is 160-240mm. The main process comprises the steps of LF refining, vacuum degassing processing, water-cooled copper plate crystallizer ingot mould casting, rolling, ACC laminar cooling and heating processing. The steel HG785D for the tower crane is large in strength and high in yield point, first-grade flaw detection can be ensured, the longitudinal impact energy at minus 20DEG C reaches 189-208J, lamellar tearing resisting performance meets the Z35 grade, microtexture comprises 64-72% of martensite and 19-25% of bainite, and the steel HG785D greatly meets the using demands of ultra-large type tower cranes.

Description

technical field [0001] The invention belongs to the technical field of production of high-strength and extra-thick welded structural steel, and in particular relates to steel HG785D for tower cranes and a production method. Background technique [0002] Tower cranes are the most commonly used and most typical large-scale construction machinery in construction, and super-large tower cranes have been almost monopolized by foreign brands for many years due to their complex key technologies and high safety and reliability requirements. Since 2008, China's hoisting machinery industry has successively developed a series of large-tonnage tower cranes. Super-large-tonnage tower cranes require high-strength and extra-thick welded structural steel materials, which require high strength and high yield points. High-strength and extra-thick welded structural steel for flaw detection and mechanical properties such as HG785D. HG785D provides basic materials for the further development of ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): C22C38/50C22C38/48C22C38/46B22D7/00B22D7/12C21D8/02C21C7/06
CPCY02P10/20
Inventor 朱书成唐郑磊许少普李忠波崔冠军赵迪康文举
Owner NANYANG HANYE SPECIAL STEEL CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products