Waterproof mortar of asphalt and preparation method of waterproof mortar
A technology of waterproof mortar and asphalt, which is applied in the field of asphalt waterproof mortar and its preparation, can solve the problems of unsatisfactory and unsatisfactory asphalt emulsification, etc., and achieve the effect of excellent construction, excellent anti-stripping ability, and low price
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] The emulsified asphalt raw material in the product of the present invention is carried out proportioning (parts by weight, the same below) as follows (table 1):
[0036] Table 1 emulsified asphalt formula table (100 parts of emulsified asphalt)
[0037]
[0038] Then the B component in the product of the present invention is carried out proportioning (parts by weight, hereinafter the same) according to the following (table 2):
[0039] Table 2 Bituminous waterproof mortar B component (100 parts of paint)
[0040] cement
filler 1
filler 2
Auxiliary 1
Auxiliary 2
[0041] gray cement
thickener
65
15
15
4
1
[0042] The preparation method of asphalt waterproof mortar is as follows:
[0043] (1) Preparation method of component A:
[0044] The preparation method of emulsified asphalt is as follows:
[0045] (1) Dehydrate 60 parts of a...
Embodiment 2
[0053] Carry out proportioning (parts by weight, the same below) with the emulsified asphalt raw material according to the following (table 3):
[0054] Table 3 emulsified asphalt formula table (100 parts of emulsified asphalt)
[0055]
[0056] The emulsified asphalt preparation method in Example 2 differs from that in Example 1 only in that the emulsified asphalt formula is added according to Table 3.
[0057] Then the B component in the product of the present invention is carried out proportioning (parts by weight, hereinafter the same) according to the following (table 4):
[0058] Table 4 B component of asphalt waterproof mortar (100 parts of paint)
[0059] cement
[0060] The difference between the preparation method of component B in Example 2 and Example 1 is only that cement, fillers and additives are added according to the ratio in Table 4.
Embodiment 3
[0062] Carry out proportioning (parts by weight, hereinafter the same) with emulsified asphalt raw material according to following (table 5):
[0063] Table 5 emulsified asphalt formula table (100 parts of emulsified asphalt)
[0064]
[0065] The emulsified bitumen preparation method in Example 3 differs from that in Example 1 only in that the emulsified asphalt formula is added according to Table 5.
[0066] Then the B component in the product of the present invention is carried out proportioning (parts by weight, the same below) as follows (table 6):
[0067] Table 6 Bituminous waterproof mortar B component (100 parts of paint)
[0068] cement
[0069] The difference between the preparation method of component B in Example 3 and Example 1 is that cement, fillers and additives are added according to the ratio in Table 6.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 