Long screw extruding bottom ramming pile machine and pile foundation filling method
A technology of long auger and pile driver, which is applied to drilling equipment and methods, sheet pile walls, earthwork drilling and mining, etc. It can solve the problems of short pile body, low pile forming efficiency, and influence on bearing strength, and achieve pile tip resistance and The effect of increasing the pile bearing capacity, reducing the discharge of virtual soil, and increasing the cross-sectional area of the pile end
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Embodiment 1 Long spiral extruded bottom pile machine
[0041] Such as figure 1 As shown, the long screw extruded bottom ramming pile machine: includes ramming and expanding hammer device (100), power head device (200), drilling tool device (300), tower (1), inclined support rod (2), auxiliary winch (3), main hoist (4), slip hoist (5), travel assembly (6), frame platform assembly (7) and counterweight (8).
[0042] Such as figure 2 As shown, the tamping and expanding hammer device (100) includes a suspension base (12), a hammer body (13) and a pin shaft (14), the suspension base (12) is fixed with the hammer body (13), and is wound around the hoist (5) One end of the steel wire rope on is fixed with hanging seat (12) by bearing pin (14). Hammer body (13) diameter is d3, and length is L,
[0043] Such as image 3 and Figure 4 As shown, the power head device (200) includes a suspension assembly (15), a slideway claw (16), a motor (17), a hardened planetary reducer...
Embodiment 2
[0072] Embodiment 2 A kind of pile foundation pouring into pile method
[0073] Such as Figure 16 As shown, the method is as follows:
[0074] 1) The long screw extruding bottom ramming pile machine is in place, and the drill bit device is aligned with the pile position; if Figure 16 (a) shown.
[0075] 2) Start the power head unit and the main hoist, apply clockwise torque and downward pressure to the drilling tool unit, and the drilling tool unit starts to drill in the way of squeezing and dumping soil until the design depth, stop pressurizing, and power Turn the head device on the spot for about 2 to 4 minutes, stop the rotation of the power head device, form the pile body hole, raise the power head device and the drilling tool device to a height of about 0.8-1 meter, and open the drill door, such as Figure 16 (b) shown.
[0076] 3) Open the filler port cover, put bricks and hard construction waste into the filler port, the amount of 10 to 15 whole bricks at a time, re...