Cableless storage seismograph low power consumption power management system and management method
A seismograph and storage technology, which is applied in the cable-free storage seismograph low-power power management system and management field, can solve practical limitations, unrealistic problems, etc., and achieve the effect of improving field practicability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0053] A low-power consumption power management method for a non-cable storage seismograph in urban and suburban areas, comprising the following steps:
[0054] A. First set up the cable-free seismograph acquisition station, connect the geophone and start it up. After the self-inspection process, the seismograph enters the collection state and works normally. At this time, the working state of the seismograph collection station can be monitored through the handheld terminal 2;
[0055] B. The cableless seismograph is in normal working condition. In order to reduce the power consumption of the seismograph acquisition station, the user sends a shutdown command 1 through the handheld terminal 2 to control the shutdown of the Beidou module 10. After the GPRS module 9 receives the handheld terminal 2 command, the command is sent as The mode of serial communication is sent to the main control unit 12 and the MSP430 single-chip microcomputer 8, and the MSP430 single-chip microcompute...
Embodiment 2
[0072] A low-power consumption power management method for a non-cable storage seismograph in urban and suburban areas, comprising the following steps:
[0073] A. First set up the cable-free seismograph acquisition station, connect the geophone and start it up. After the self-inspection process, the seismograph enters the acquisition state and works normally. At this time, the working state of the seismograph acquisition station can be monitored by the GPRS network server 3;
[0074] B. The cableless seismograph is in normal working condition. In order to reduce the power consumption of the seismograph acquisition station, the user sends a shutdown command 1 through the GPRS network server 3 to control the shutdown of the Beidou module 10. After the GPRS module 9 receives the GPRS network server 3 instructions, the The command is sent to the main control unit 12 and the MSP430 single-chip microcomputer 8 in the form of serial port communication. After the MSP430 single-chip m...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com