Low-rank coal upgrading and power generation integrated system based on the combination of solar energy and coal gasification
A comprehensive system and coal gasification technology, applied in the direction of energy input, machine/engine, steam engine device, etc., can solve the problems of high cost of quality improvement, high cost, energy waste, etc., to achieve full cascade utilization of energy, avoid waste, and low cost Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The present invention proposes a low-rank coal upgrading and power generation integrated system based on the combination of solar energy and coal gasification, which will be described below with reference to the accompanying drawings and examples.
[0021] Such as figure 1 In the schematic diagram of the low-rank coal upgrading-power generation integrated system based on the combination of solar energy and partial coal gasification, the pyrolyzer 2 of the system is connected to the pre-drying device 4, solar collector 1, boiler 3, blower 8, coal / Semi-coke cooler 5 solid inlet and steam turbine 6 steam extraction port; boiler 3 is connected to steam turbine 6 inlet, and steam turbine 6 is connected to generator 7. The water side inlet of the coal / semi-coke cooler 5 is connected to the condenser 9, and the water side outlet is connected to the boiler 3.
[0022] The air inlet of the pre-drying device 4 is connected to the exhaust port A of the boiler, and the gas outlet...