Cement concrete pavement renewing material and preparation method thereof
A technology of cement concrete and sulfoaluminate cement is applied in the preparation of the above-mentioned cement concrete pavement renovation materials, and in the field of cement concrete pavement renovation materials to achieve the effects of less construction waste, strong cohesion, and prevention of diffusion and spread
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0063] A cement concrete pavement refurbishment material, its formula composition includes: 275kg of P·Ⅱ 52.5R type Portland cement, 250kg of 42.5# type sulfoaluminate cement, 300kg of medium sand, 27kg of anhydrous gypsum, 15.5 kg of PVA fiber, 1kg of square fiber, 1.5kg of carbon fiber, 1.5kg of steel fiber, 35kg of acrylic redispersible latex powder, 10kg of EVA redispersible latex powder, 2.8kg of polycarboxylate superplasticizer, 2kg Defoamer, 1.2kg of tartaric acid, 2.2kg of silicone water repellent, 1.3kg of lithium carbonate, 0.5kg of hydroxypropyl methylcellulose, 30kg of fly ash and 45kg of slag powder, water for products The amount is 20% of the total weight of the cured product.
[0064] The pavement restoration and opening to traffic of this embodiment takes about 12 hours.
Embodiment 2
[0066] A cement concrete pavement refurbishment material, its formula consists of: 470kg of P·Ⅱ 52.5R type Portland cement, 50kg of 42.5# type sulphoaluminate cement, 200kg of medium sand, 32.5kg of anhydrous gypsum, 12kg of PVA fiber, 5kg of square fiber, 3kg of carbon fiber, 3kg of steel fiber, 80kg of EVA redispersible latex powder, 2.8kg of polycarboxylate superplasticizer, 3.6kg of defoamer, 1.8kg of tartaric acid , 4kg of silicone water repellent, 1.8kg of lithium carbonate, 3.5kg of hydroxypropyl methylcellulose, 80kg of fly ash and 50kg of slag powder, the water consumption of the product is 19% of the total weight of the cured product.
[0067] The pavement restoration and opening to traffic of this embodiment takes about 48 hours.
Embodiment 3
[0069] A cement concrete pavement refurbishment material, its formula composition includes: 150kg of P·Ⅱ 52.5R type Portland cement, 375kg of 42.5# type sulphoaluminate cement, 280kg of medium sand, 12kg of anhydrous gypsum, 2.5 kg of PVA fiber, 5kg of square fiber, 5kg of carbon fiber, 5kg of steel fiber, 30kg of EVA redispersible latex powder, 2.5kg of polycarboxylate superplasticizer, 1.5kg of defoamer, 3.5kg of tartaric acid , 2.3kg of silicone water repellent, 2kg of lithium carbonate, 1.7kg of hydroxypropyl methylcellulose, 40kg of fly ash and 100kg of slag powder, the water consumption of the product is 18% of the total weight of the cured product.
[0070] The pavement restoration and opening to traffic of this embodiment takes about 4 hours.
[0071] The cement concrete pavement renovation material of embodiment 1~3 is obtained by following method:
[0072] (1) Ordinary Portland cement, sulphoaluminate cement, anhydrous gypsum, medium sand, redispersible latex powder...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com