A kind of composite asphalt cold patch material and its preparation method
A composite asphalt and cold patch technology, which is applied in the field of emergency repair materials for asphalt pavement potholes, can solve the problems of emulsified asphalt and high mixing process requirements, high compaction process requirements, uneven mixing of mixtures, etc., and achieve high strength And anti-water stripping performance, simple construction process, low cost of use
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Weigh 3g of polymer asphalt cold replenishment fluid (produced by Chongqing Chengbang Technology, model KP-1), 20g of 10-20mm limestone stone, 20g of 10-15mm limestone stone, 30g of 5-10mm limestone stone, 27g of 1-3mm basalt stone; At room temperature, add stones to the forced mixer one by one, start the mixer, and stir for 5 to 15 seconds; add polymer asphalt cold replenishment fluid and continue to stir for 30 to 60 seconds, and the obtained uniform granular mixture is the composite asphalt cold replenishment described in the present invention. material.
[0025] The compound asphalt cold patch material that present embodiment is made carries out performance measurement, and its data are as shown in table 1 below:
[0026] Table 1 Performance index of composite asphalt cold patch
[0027]
Embodiment 2
[0029] Weigh 3.5g of polymer asphalt cold replenishment fluid (produced by Chongqing Chengbang Technology, model KP-1), 15g of 10-20mm limestone stone, 25g of 10-15mm limestone stone, 27.5g of 5-10mm limestone stone, 27g of 1-3mm basalt stone ; at normal temperature, add the stones into the forced mixer one by one, start the mixer, and stir for 5-15 seconds; add polymer asphalt cold replenishment fluid and continue stirring for 30-60 seconds, and the obtained uniform granular mixture is the composite asphalt of the present invention Cold feed.
[0030] The composite asphalt cold patch material that present embodiment is made carries out performance measurement, and its data are as shown in table 2 below:
[0031] Table 2 Performance index of composite asphalt cold patch
[0032]
Embodiment 3
[0034] Weigh 4g of polymer asphalt cold replenishment liquid (produced by Chongqing Chengbang Technology, model KP-2), 25g of 10-15mm basalt rock, 40g of 5-10mm basalt rock, 31g of 1-3mm basalt rock; In the forced mixer, start the mixer and stir for 5-15 seconds; add polymer asphalt cold replenishment fluid and continue stirring for 30-60 seconds, and the obtained uniform granular mixture is the composite asphalt cold replenishment material of the present invention.
[0035] The compound asphalt cold patch material that present embodiment is made carries out performance measurement, and its data are as shown in table 3 below:
[0036] Table 3 Performance index of composite asphalt cold patch
[0037]