A Method of Accurately Controlling the Elevation of Cement Bridge Deck Pavement
A precise control and bridge deck paving technology, applied in bridges, bridge parts, bridge construction, etc., can solve the problems of difficult elevation control network, too many consumables for elevation control network, inability to recycle, etc., to speed up the construction progress, Guarantee the quality of construction and the effect of small amount of construction work
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0035] According to the width of the bridge deck, determine the pile position layout of the reinforced piles. The bridge deck of this project is 16.75 meters wide, and the reinforced piles are arranged in three rows along the route. The distance between the reinforced piles in each row of reinforced piles is one meter apart. Use red paint to mark the pile position of each steel pile on the beam surface; use an electric hammer with a drill bit diameter of 12mm to drill holes one by one for the marked pile locations, and the holes are 5 cm deep into the T-beam roadway slab; the steel pile is 17 cm long. Cold-drawn φ10 light round steel bars are made, and the finished steel bar piles are inserted into the holes one by one; then the measured elevation of the T-beam top of each hole is accurately measured, the corresponding actual bridge deck thickness is calculated, and the actual length of the steel bar piles is determined; Mark the position of the top of the steel bar pile, and u...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 