A method for treating precipitation in waterproof construction of underground building pit body
A technology of underground construction and treatment method, which is applied in the direction of construction and infrastructure engineering, etc. It can solve the problems of threatening structural safety, unreliable overlapping of waterproof coiled materials, and inability to form a waterproof coating film, so as to ensure the effect of construction quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0028] Such as figure 1 As shown, a dewatering pit 1 is set at the bottom of the underground building pit body, and a pump 2 is placed in the dewatering pit 1 for pumping out the surface construction water in the well and the shallow groundwater at the bottom of the pit. A cover plate 3 is arranged above the precipitation pit 1, and a casing 31 or a hole is reserved in the center of the cover plate 3, and the water pump cable and the drain pipe 21 pass through the casing 31 or the hole. The waterproof layer 4 at the bottom of the pit body is laid to the sleeve pipe 31 or the peripheral closure of the hole, and the protective layer 5 is laid to isolate and protect the waterproof layer. The surface of the waterproof layer is laid with an isolation layer 6, which can be made of plastic film, paper-based linoleum, tarpaulin, colored strip cloth, etc.; the ...