Molten steel continuous pouring method for extremely-low phosphorus-sulfur high alloy steel through single LF furnace and multiple tanks
A high-alloy steel, phosphorus-sulfur technology, applied to the improvement of process efficiency, manufacturing converters, etc., can solve the problems of high production cost per ton of steel, long processing time of molten steel, and poor steel quality, so as to reduce smelting costs, Save process energy consumption and improve quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0024] 1. Before the production of the converter, arrange to cast low-silicon aluminum-killed steel once, control the converter tapping P≤0.015%, and rinse the RH vacuum tube for 3 times.
[0025] 2. The ladle containing molten steel is rinsed with low-silicon aluminum-killed steel for 4 times to control the rephosphorization of the ladle.
[0026] 3. The molten iron Si is controlled at 0.4%, the temperature is 1350°C, the scrap steel is 25 tons of light and pure scrap steel, and the molten iron is 270 tons. The charging sequence is to add scrap steel first and then add molten iron to prevent the scrap steel from sticking to the large surface.
[0027] 4. After pre-desulfurization of molten iron, the sulfur is 0.0010%, and the slag is removed thoroughly, and there is no block of slag on the surface of the molten iron.
[0028] 5. The converter is smelted by a double-link method. In order to improve the dephosphorization effect in the early stage, the oxygen blowing flow rate o...
Embodiment 2
[0034] 1. Before the production of the converter, arrange to cast low-silicon aluminum-killed steel once, control the converter tapping P≤0.015%, and rinse the RH vacuum tube for 4 times.
[0035] 2. The ladle containing molten steel is rinsed with low-silicon aluminum-killed steel for 3 times to control the rephosphorization of the ladle.
[0036] 3. The molten iron Si is controlled at 0.5%, the temperature is 1320°C, the scrap steel is 23 tons of light and pure scrap steel, and the molten iron is 270 tons. The charging sequence is to add scrap steel first and then add molten iron to prevent the scrap steel from sticking to the large surface.
[0037] 4. After the molten iron is pre-desulfurized, the sulfur is 0.0008%, and the slag is removed thoroughly, and there is no block of slag on the surface of the molten iron.
[0038] 5. The converter is smelted by the double-link method, and the oxygen blowing flow rate of the dephosphorization furnace top gun is set to 48000m 3 / h...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com