Maintenance technology of natural and artificial grass mixed lawn
A technology of lawn and craftsmanship, applied in the field of maintenance technology of mixed lawn with real and fake grass, to achieve the effect of uniform density, stability and sustainable use
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0041] A maintenance process for a mixed lawn of real and fake grass, comprising:
[0042] Steps of base fertilizer application: before sowing real grass seeds, sprinkle granular fertilizer on the soil at a rate of 10g / m 2 , and rake the soil;
[0043] Trimming steps: trim the real grass when it grows to a height of 5cm, and the trimmed part does not exceed 1 / 3 of the total height of the real grass;
[0044] Steps of leaching fertilization: When the real grass grows to three leaves, spray the compound fertilizer in the form of leaching, and the fertilization rate is 4g / L / m 2 ; Conduct once 8 days before Chengping, and once 6 weeks after Chengping;
[0045] Irrigation steps: irrigate once every 2 days; the depth of the moist soil layer is 6cm;
[0046] Surface soil application step: first carry out the pruning step and then carry out the surface application soil step; perform surface application soil once in the germination stage and growth stage of true grass; after surface...
Embodiment 2
[0056] A maintenance process for a mixed lawn of real and fake grass, comprising:
[0057] Steps of base fertilizer application: before sowing real grass seeds, sprinkle granular fertilizer on the soil, and the amount of fertilizer applied is 18g / m2 , and rake the soil;
[0058] Trimming steps: trim the real grass when it grows to a height of 5cm, and the trimmed part does not exceed 1 / 3 of the total height of the real grass;
[0059] Steps of leaching fertilization: when the real grass grows to three leaves, spray the compound fertilizer in the form of leaching, and the fertilization rate is 3g / L / m 2 ; Once in 9 days before Chengping, once in 8 weeks after Chengping;
[0060] Irrigation steps: irrigate once every 3 days; the depth of the moist soil layer is 7cm;
[0061] Surface soil application step: first carry out the pruning step and then carry out the surface application soil step; perform surface application soil once in the germination stage and growth stage of true ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com