[0021] Example 1.
[0022] The invention discloses an ecological submerged dam system and a construction method for urban landscape rivers. The ecological submerged dam system includes a submerged dam 1, a stilling pond 2, a waterwheel 3, submerged plants 4, and a mud trough 5; the stilling pond 2 includes a protective tank and a sill; the submerged dam 1 and The force pond 2 is constructed by a gabion cage; the water wheel 3 is located downstream of the submerged dam 1 and above the head end of the stilling pond 2; the submerged plants 4 are located on the top of the sill. The water flow falling from the top of the dam drives the waterwheel 3 to rotate, continuously rolling up and falling the water body in the stilling pool 2, causing the water body to be fully aerated and dissolved oxygen along the way, and the highly oxygenated water body flows through the latent structure formed by the film-hanging gabion cage. When dam 1 and stilling pool 2, the eutrophic substances in the ...
Example Embodiment
[0028] Example 2.
[0029] The present invention also provides a construction method of a submerged dam system used in a landscape river course as follows: First, riverbed cleaning. Excavate and clean up the riverbed at the dam site. Second, the production of gabion cages. In the prefabrication factory, according to the design requirements, the biofilm is hung on the gravel to form the film-mounted gravel, and the gabion cage is made at the same time, and finally the film-mounted gravel is filled into the gabion cage to form a specific film-mounted stone cage. . Third, it is fixed on site. Use a crane to hoist the film-mounted gabion cages completed in the prefabrication plant on the cleaned river bed, and perform lap reinforcement between the gabion cages to form the submerged dam 1, the stilling pool 2, etc. , The main construction is completed, the submerged plants 4 are planted on the top of the bottom sill of the stilling pool 2, and finally the waterwheel 3 is installed...
PUM
Property | Measurement | Unit |
---|---|---|
Diameter | aaaaa | aaaaa |
Particle size | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap