Ice layer drilling method of ultrasonic vibration air reverse circulation
A technology of air reverse circulation and ultrasonic waves, which is applied in the direction of ice drilling, vibration drilling, drilling equipment and methods, etc., can solve the problems of low drilling efficiency and sampling efficiency, reduce auxiliary operation time, and protect the ecological environment , the effect of guaranteeing life safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] In a delineated cold environment area where ice cores are drilled for scientific research, ultrasonic drilling is used during drilling and air reverse circulation is used for continuous sampling.
[0030] Specific steps are as follows:
[0031] According to requirements, continuous coring of the ice layer 1000m underground is required this time;
[0032] Step 1. After determining the drilling implementation plan based on the on-site exploration, complete the drilling positioning and drilling rig preparation work;
[0033] Step 2. Select the cored piezoelectric ceramic according to the drilling plan, and select the piezoelectric ceramic 1 of the appropriate size according to the requirements. The inner diameter of the piezoelectric ceramic 1 is smaller than the radius of the armored cable central channel 5, the amplitude is 30μm, and the vibration frequency is 30KHz, then install the ultrasonic vibration drilling device, assemble piezoelectric ceramic 1, power amplifier 2, signa...
Embodiment 2
[0039] In a delineated cold environment area for drilling into ice layers, ultrasonic drilling is used during drilling and air reverse circulation is used to remove ice debris. The specific steps are as follows:
[0040] According to the requirements, it is necessary to drill into the ice layer 1000m underground this time;
[0041] Step 1. After determining the drilling implementation plan based on the on-site exploration, complete the drilling positioning and drilling rig preparation work;
[0042] Step 2. Select the full-scale piezoelectric ceramic according to the drilling plan. The full-scale piezoelectric ceramic has a water gap 101, and select a suitable size piezoelectric ceramic 1 according to the requirements, with an amplitude of 30μm and a vibration frequency of 30KHz, and then ultrasonic Installation of vibrating drilling device, assembling piezoelectric ceramic 1, power amplifier 2, signal transmitter 3, armored cable 4, cable winch 8, electronic control system 9, ice sa...