Wind-sand damage prevention and control protection zone in extremely dry desert area and use method thereof
A protection zone and desert technology, applied in the field of desert restoration, to achieve the effect of reducing the cost of raw materials, reducing the amount of materials, and improving the durability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0070] The method of using the wind-sand hazard prevention and control protection belt in the extremely arid desert area includes the following steps:
[0071] A. Preparation of restoration mixture
[0072] The mixed soil is not crushed, and additives and fertilizers are added to the mixed soil and mixed evenly. The mixed soil is prepared by the following parts by weight: 90 parts of mixed soil, 5 parts of additives, the mixed soil includes loess, the additive is carboxymethyl cellulose, and the fertilizer is Animal manure, potash, phosphorus and nitrogen fertilizers;
[0073] B. Prepare sand barrier inner core
[0074] The upper quicksand of the dune is directly piled into the inner core of the sand barrier of the hollow cylinder; the cross section of the hollow cylinder is quadrilateral;
[0075] C. Cover the shell of the sand barrier
[0076] Mixed soil covers the inner core of the sand barrier to form a desertification environment restoration mixed soil sand barrier, th...
Embodiment 2
[0084] The method of using the wind-sand hazard prevention and control protection belt in the extremely arid desert area includes the following steps:
[0085] A. Preparation of restoration mixture
[0086] The mixed soil is not crushed, and additives and fertilizers are added to the mixed soil and mixed evenly. The mixed soil is prepared by the following parts by weight: 100 parts of mixed soil, 10 parts of additives, the mixed soil includes red soil, white soil and black soil, and the additive is carboxylate Methyl cellulose, water glass and straw, fertilizers are animal manure, potassium fertilizer, phosphorus fertilizer and nitrogen fertilizer;
[0087] B. Prepare sand barrier inner core
[0088] The upper quicksand of the dunes is directly piled into the inner core of the hollow cylinder; the cross section of the hollow cylinder is circular;
[0089] C. Cover the shell of the sand barrier
[0090] Mixed soil covers the inner core of the sand barrier to form a desertifi...
Embodiment 3
[0098] The method of using the wind-sand hazard prevention and control protection belt in the extremely arid desert area includes the following steps:
[0099] A. Preparation of restoration mixture
[0100] The mixed soil is not pulverized, and additives and fertilizers are added to the mixed soil and mixed evenly. The mixed soil is prepared by the following parts by weight: 95 parts of mixed soil and 10 parts of additives. The mixed soil includes loess, red soil, white soil, black soil and lime calcium soil. , the additive is carboxymethyl cellulose, water glass and straw, the additive is a mixture of carboxymethyl cellulose, water glass and straw at a ratio of 1:1:1 by weight, and the fertilizer is animal manure, potassium fertilizer, phosphate fertilizer and nitrogen fertilizer;
[0101] B. Prepare sand barrier inner core
[0102] The upper quicksand of the dunes is directly piled up into the sand barrier inner core of the hollow cylinder; the cross section of the hollow c...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


