Greening method of high-water-level coast dredger fill
A technology of blowing soil and high water level, which is applied in the field of landscaping, can solve the problems of poor salt drainage and drainage, short green landscape maintenance time, etc., and achieve the effects of ensuring durability, promoting exchange capacity, and increasing organic matter content.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] A greening method for dredging and filling soil in a high water level coastal area, comprising the following steps:
[0033] 1) Collect dredging fill and expose to the sun to remove water: collect 600m 3 The dredged fill soil is piled high, exposed to the sun for 4 days to drain, and the moisture content of the dredged fill soil is reduced to 25%;
[0034] 2) Improving dredger fill: mix the raw dredge fill soil with composted and fermented sludge from urban sewage plants at a volume ratio of 1:0.3, and add 18kg of desulfurized gypsum powder to mix evenly;
[0035] 3) Lay the isolation cushion: level the land in the area to be greened, compact it, and lay a 10cm thick isolation cushion with gravel;
[0036] 4) Laying drainage and salt discharge pipes: reasonably lay PVC drainage and salt discharge pipes with a diameter of 15cm according to the greening location and direction, with a slope of 0.3%, and small holes are opened on the drainage and salt discharge pipes and w...
Embodiment 2
[0041] Located in the dredging soil greening demonstration site near Ganghong Road, Nangang Industrial Park, Binhai New Area, Tianjin, with a total area of 2000m 2 , using this greening method for greening, according to the attached figure 1 The construction model diagram shown in the construction:
[0042] 1) Collect dredging fill and expose to the sun to remove water: collect 600m 3 The dredged fill soil is piled high, exposed to the sun for 5 days and drained until the moisture content of the dredged fill soil drops to 15%;
[0043] 2) Improvement of dredger fill: mix the original soil of dredge fill with composted and fermented sludge from urban sewage plants at a volume ratio of 1:1 to form a 2m 3 Mix soil, add 20kg desulfurized gypsum powder at the same time and mix evenly;
[0044] 3) Laying isolation cushion 1: Level and compact the area to be greened (length 100m, width 20m), and lay a 5cm-thick isolation cushion with crushed stones with a diameter of 0.6-1.0cm;
...
PUM
Property | Measurement | Unit |
---|---|---|
Diameter | aaaaa | aaaaa |
Diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com