Construction method for subway stations in combined construction of highway and subway

A construction method and technology for subway stations, which are applied in underground chambers, earth-moving drilling, wellbore lining, etc., can solve the problems of deformation of surrounding buildings, difficult underground excavation construction, and small thickness of covering soil, so as to avoid damage to building structures. , improve safety performance, reduce the effect of differential settlement

Inactive Publication Date: 2018-09-25
CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP
View PDF4 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Further research found that because the top floor of the "highway-rail joint construction" station is a road tunnel, the lower layer of the road tunnel is the station hall floor and platform floor of the subway station in turn. The secondary stress transformation with discontinuous vertical stress on the storey has the following technical problems during construction: (1) construction difficulties due to the large depth of the station and the complex surrounding environment; (2) the structural change of the main structure from top to bottom, resulting in The force conversion is discontinuous, (3) may cause deformation of surrounding buildings, and the safety of the foundation pit itself and external structures is difficult to guarantee, (4) the project cost is high
The underground stations of "highway-rail joint construction" are usually large in scale and deep, and the clearance and layout of highway tunnels and stations are different, so it is difficult to ensure the continuous force of the structure in the vertical direction, and the traditional construction method is difficult to ensure the smooth implementation of the project
In addition, the underground stations of "co-construction of highways and railways" are usually located in busy traffic areas, and do not have the conditions for open-excavation construction; the thickness of the covering soil above the stations is small, and the soil is soft, and it is difficult to use underground excavation for construction
Based on a comprehensive comparison, the cover-and-excavation method was selected for construction. However, due to the discontinuous force on the station structure in the vertical direction, the standard cover-and-excavation method and the cover-excavation method cannot meet the construction requirements.
[0005] In view of the above technical problems, there is an urgent need to design a new construction method in this field, so that it can avoid problems such as difficult construction and discontinuous force transfer during the construction process, and meet the construction needs of the "road-rail joint construction" project

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for subway stations in combined construction of highway and subway
  • Construction method for subway stations in combined construction of highway and subway

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not constitute a conflict with each other.

[0034] figure 2 It is the longitudinal sectional view of the subway station of the present invention, such as figure 2 As shown, the structure of the subway station includes the road tunnel layer, equipment interlayer, station hall layer, and platform layer from the ground down, and also includes the following components: underground diaphragm wall 1, column piles 2, middle columns 3, and str...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention belongs to the technical field of underground space construction, and particularly relates to a construction method for subway stations in combined construction of highway and subway. The method specifically comprises the following steps: S1 constructing an underground continuous wall and casting a plurality of column piles on the inner side of the underground continuous wall; S2 aligning steel pipes and hoisting the steel pipes on the column piles and pouring concrete to form intermediate columns and side span columns of a concrete steel pipe structure; S3 constructing structural roofs and intermediate structure layers from top to bottom gradually and excavating a soil body below a plate till pouring of a structural base slab is completed; S4 constructing structural side walls from bottom to top layer by layer and simultaneously constructing side span structure inner walls and highway tunnel structure inner walls; S5 cutting off the intermediate columns and the side spancolumns of the top layer to complete the construction. The method can effectively solve the problem that the stress conversion multilayer underground structure is difficult to construct, ensures smooth stress conversion of the main body structure, meanwhile can reasonably control the cost, ensures the safety of a foundation pit and the external structures, and is suitable for the construction ofthe subway stations in combined construction of the highway and the subway.

Description

technical field [0001] The invention belongs to the technical field of underground space construction, and more specifically relates to a construction method for a subway station jointly built by public roads and railways. Background technique [0002] With the increasing shortage of above-ground space, the underground space will inevitably develop in the direction of larger scale, deeper depth and more complex functions. Underground multi-layer force transfer structures will gradually increase. Integration saves space resources, relieves urban traffic pressure, and is more and more used in urban traffic construction. [0003] Further research found that because the top floor of the "highway-rail joint construction" station is a road tunnel, the lower layer of the road tunnel is the station hall floor and platform floor of the subway station in turn. The secondary stress transformation with discontinuous vertical stress on the storey has the following technical problems dur...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00E21D11/10E21D13/00
CPCE21D9/00E21D11/107E21D13/00
Inventor 张建明董俊罗会平欧阳冬
Owner CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products