A kind of highly hydrolysis-resistant low-pressure variable TPU film and preparation method thereof
A technology of hydrolysis resistance and low pressure change, applied in the field of polymer composite materials, can solve the problems of low tear strength and fracture of foam materials, and achieve the effect of high hardness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] A composite foaming material, comprising the following raw material components in parts by mass:
[0046]
[0047]
[0048] The preparation method of above-mentioned composite foam material is as follows:
[0049] (1) According to the formula, add other components except foaming agent, sulfur and accelerator into the banbury mixer for banburying. The banburying time is 10 minutes, and the degumming temperature is 150°C to obtain the mixed rubber;
[0050] (2) Put the mixed rubber obtained in step (1) for 12 hours, then put it into the open mill together with foaming agent, sulfur and accelerator, knead at 50°C for 30 minutes, pass through three times and then release the mixture to obtain the mixed rubber. Rubber sheet;
[0051] (3) Put the mixed rubber sheet obtained in step (2) into a mold, put it into a flat vulcanizer, and vulcanize it for 5 minutes under the conditions of a pressure of 7 MPa and a temperature of 180° C., and obtain the above-mentioned compos...
Embodiment 2
[0053] A composite foaming material, comprising the following raw material components in parts by mass:
[0054]
[0055] The preparation method of above-mentioned composite foam material is as follows:
[0056] (1) According to the formula, add other components except foaming agent, sulfur and accelerator into the internal mixer for banburying. The banburying time is 20min, and the debinding temperature is 140°C to obtain the mixed rubber;
[0057] (2) Put the mixed rubber obtained in step (1) for 24 hours, then put it into the open mill together with foaming agent, sulfur and accelerator, knead it at 60°C for 20 minutes, pass through it three times and then release it to obtain the mixed rubber. Rubber sheet;
[0058] (3) Put the mixed rubber sheet obtained in step (2) into a mold, put it into a flat vulcanizer, vulcanize for 10 minutes under the conditions of a pressure of 10 MPa and a temperature of 170° C., and obtain the above-mentioned composite foam material after ...
Embodiment 3
[0060] A composite foaming material, comprising the following raw material components in parts by mass:
[0061]
[0062] The preparation method of above-mentioned composite foam material is as follows:
[0063] (1) According to the formula, add other components except foaming agent, sulfur and accelerator into the banbury mixer for banburying. The banburying time is 15min, and the degumming temperature is 145°C to obtain the mixed rubber;
[0064] (2) Put the mixed rubber obtained in step (1) for 15 hours, then add it into the open mill together with foaming agent, sulfur and accelerator, mix it at 55°C for 25 minutes, pass through three times and then release it to obtain the mixed rubber. Rubber sheet;
[0065] (3) Put the mixed rubber sheet obtained in step (2) into a mold, add it to a flat vulcanizer, and vulcanize it for 8 minutes under the conditions of a pressure of 8 MPa and a temperature of 175° C., and obtain the above-mentioned composite foam material after pre...
PUM
| Property | Measurement | Unit |
|---|---|---|
| diameter | aaaaa | aaaaa |
| length | aaaaa | aaaaa |
| tensile strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


