Construction method and construction structure for stacked gangue reforestation project
A construction method and technology of coal gangue, which are applied in the fields of infrastructure engineering, botanical equipment and methods, soil protection, etc., can solve the problems of unreported ecological restoration technology, single plant species, etc. Achieve the effect of ecological restoration and avoid collapse
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0090] This embodiment 1 provides a construction method of a coal gangue rebuilding project, which includes the following steps:
[0091] Step 1. Make an ecological bag 30, which includes a bag body and water-retaining soil filled in the bag body;
[0092] Step 2. According to the actual topography of the accumulated coal gangue 10, the ecological bag 30 is layered layer by layer from bottom to top on the surface of the accumulated coal gangue 10, so that a layered layer from bottom to top is formed on the surface of the accumulated coal gangue 10 Several fixed layers 20, each fixed layer 20 includes a plurality of ecological bags 30 arranged in sequence in a direction surrounding the piled coal gangue 10;
[0093] Step 3. Use a fixed gripper 40 to fix the eco-bags 30 in adjacent fixed layers 20 together, thereby connecting the plurality of fixed layers 20 together;
[0094] Step 4. An opening is formed on the surface of the ecological bag 30, a woody plant 50 is planted in the openin...
Embodiment 2
[0108] This embodiment 2 provides a construction method of a coal gangue re-greening project. Compared with the above embodiment 1, the difference is that: the mass percentage of the water-retaining agent in the water-retaining soil is 6%, and the surface of the bag body The porosity is 28%; the woody plant 50 is crape myrtle; the fine soil 60 is a clay soil with a particle size between 2 mm and 3 mm.
Embodiment 3
[0110] This embodiment 3 provides a construction structure of a coal gangue re-greening project, which is obtained by using the construction method of the coal gangue re-greening project described in embodiment 1.
PUM
Property | Measurement | Unit |
---|---|---|
Particle size | aaaaa | aaaaa |
Particle size | aaaaa | aaaaa |
Particle size | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com