Face reinforcing device for soft rock tunnel and construction method thereof

A technology of reinforcement device and face, which is used in earth-moving drilling, installation of bolts, mining equipment, etc., can solve the problems of endangering the personal safety of construction workers, collapse of the face of soft rock tunnels, and increasing investment in engineering construction. Improve the construction efficiency, the effect is good, the factory value and economic benefits are remarkable

Pending Publication Date: 2019-05-31
SOUTHWEST JIAOTONG UNIV
View PDF0 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] During the construction of the tunnel project, it is inevitable to encounter various complex engineering geological conditions, which bring difficulties to the project construction; for example, after the excavation of the soft rock tunnel, due to the deformation around the tunnel, the support is not timely implemented Causes such as operation and groundwater erosion will cause disasters such as collapse, falling rocks, and falling blocks on the face of the soft rock tunnel; these not only cause construction difficulties, destroy construction equipment, prolong the construction period, and more seriously, directly endanger the lives of construction personnel. safety, causing significant economic losses; in the construction of large-section shallow tunnels in weak rock, the step method, CRD method, and double-side-wall pilot pit method are usually used for construction; but these methods have complicated construction procedures, serious waste of materials, and slow project progress. Difficult to meet the needs of current engineering construction
[0003] With the construction of a large number of underground projects, the degree of mechanized construction has been continuously improved, and new technologies and processes have been adopted by many domestic projects; It is widely used in some tunnel projects with very complex engineering geological conditions; however, pre-reinforcement measures usually use steel bars and shotcrete to pre-reinforce the advanced core soil in front of the tunnel face under weak surrounding rock geological conditions; but after the core soil is reinforced Excavation still needs to be carried out, and the cutting of steel bars will not only increase the investment in engineering construction, but the second-stage production process is complicated, resulting in waste of materials, which greatly reduces the efficiency of tunnel excavation, which is not conducive to rapid construction and difficult to popularize and apply

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Face reinforcing device for soft rock tunnel and construction method thereof
  • Face reinforcing device for soft rock tunnel and construction method thereof
  • Face reinforcing device for soft rock tunnel and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0026] A reinforcement device for the face of a soft rock tunnel, comprising a protective layer arranged along the face of the tunnel 2; also including a plurality of hollow structural anchors 3 inserted into the soft rock tunnel 1 perpendicular to the face 2 of the tunnel; the anchor The surface of the anchor 3 is provided with a plurality of overflow holes 4, and the concrete slurry 5 in the anchor rod 3 can overflow through the overflow holes 4; the tail end of the anchor rod 3 is provided with a wooden wedge 6.

[0027] The anchor rod 3 is a bamboo anchor rod, and one end of the anchor rod 3 penetrates into the soft rock tunnel 1 and is provided with cracks along its circumference; the overflow holes 4 are distributed in a plum blossom shape on the rod body of the anchor rod 3 . The anchor rods 3 are distributed in an array structure or arr...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a face reinforcing device for a soft rock tunnel and a construction method thereof. The face reinforcing device comprises a protective layer arranged along a tunnel face and further comprises multiple hollow-structure anchor rods inserted into the soft rock tunnel by being perpendicular to the tunnel face. Multiple grout vent holes are formed in the surfaces of the anchor rods, and concrete grout in the anchor rods can flow out through the grout vent holes. Wooden wedges are arranged at the tail ends of the anchor rods. After advanced core soil of the face of the soft rock tunnel is pre-reinforced, the anti-pulling and anti-shearing capacity of the anchor rods can be fully exerted, total-length anchoring is achieved, the stability of the tunnel face is greatly improved, arch apex excessive convergence and pre-convergence deformation in the radial direction of the tunnel and extrusion deformation of the tunnel face can be avoided, an excavation machine can directly excavate and pass the tunnel, the safety in the construction process is improved, the labor intensity of workers can also be relieved, the tunneling speed is increased, the supporting cost is low,economic benefits of engineering are increased, and the application prospects are broad.

Description

technical field [0001] The invention relates to the technical field of advance reinforcement of soft rock tunnels, in particular to a reinforcement device for the tunnel face of soft rock tunnels and a construction method thereof. Background technique [0002] During the construction of the tunnel project, it is inevitable to encounter various complex engineering geological conditions, which bring difficulties to the project construction; for example, after the excavation of the soft rock tunnel, due to the deformation around the tunnel, the support is not timely implemented Causes such as operation and groundwater erosion will cause disasters such as collapse, falling rocks, and falling blocks on the face of the soft rock tunnel; these not only cause construction difficulties, destroy construction equipment, prolong the construction period, and more seriously, directly endanger the lives of construction personnel. safety, causing significant economic losses; in the construc...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E21D21/00E21D20/02
Inventor 张俊儒燕波严丛文徐剑王智勇李强
Owner SOUTHWEST JIAOTONG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products