Quick-hardening high-strength asphalt cold patch material and preparation method thereof
A technology of cold patch and asphalt, which is applied in the field of road engineering materials, can solve the problems of poor strength of asphalt cold patch, damage of cold patch, and poor service life, etc., and achieve good early strength, reduce viscosity, and improve initial strength.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0021] The asphalt used is No. 70 A grade road petroleum asphalt, the aggregate is limestone crushed stone, the filler is limestone powder, the diesel is commercially available No. 0 diesel, and the chemical reagents are all commercially available chemical reagents.
[0022] 1. Synthesize special cold tonic first
[0023] (1) Tall oil and concentrated sulfuric acid are selected and weighed in a molar ratio of 1:0.4, the tall oil is loaded into the reactor, and concentrated sulfuric acid is added dropwise while stirring. The reaction temperature is 35°C, the stirring speed is 300r / min, and the titration time is 0.5 h, to obtain the intermediate product A.
[0024] (2) Put the product A into the reactor, titrate the alkali while stirring, the reaction temperature is 25° C., the stirring speed is 200 r / min, until the solution pH=8.5, stop the titration, and obtain the surfactant B.
[0025] (3) Stir and mix turpentine and acetic acid according to a mass ratio of 1:0.1 to obtain ...
Embodiment 2
[0039] The asphalt used is No. 70 A grade road petroleum asphalt, the aggregate is limestone crushed stone, the filler is limestone powder, the diesel is commercially available No. 0 diesel, and the chemical reagents are all commercially available chemical reagents.
[0040] 1. Synthesize special cold tonic first
[0041] (1) Tall oil and concentrated sulfuric acid are selected and weighed at a molar ratio of 1:0.5, and the tall oil is loaded into the reactor, and concentrated sulfuric acid is added dropwise while stirring, the reaction temperature is 40°C, the stirring speed is 400r / min, and the titration time is 0.8 h, to obtain the intermediate product A.
[0042] (2) Put the product A into the reactor, titrate the alkali while stirring, the reaction temperature is 28° C., the stirring speed is 300 r / min, until the solution pH=9, stop the titration, and obtain the surfactant B.
[0043] (3) Stir and mix turpentine and acetic acid at a mass ratio of 1:0.15 to obtain a turpe...
Embodiment 3
[0057] The asphalt used is No. 70 A grade road petroleum asphalt, the aggregate is limestone crushed stone, the filler is limestone powder, the diesel is commercially available No. 0 diesel, and the chemical reagents are all commercially available chemical reagents.
[0058] 1. Synthesize special cold tonic first
[0059] (1) Select and weigh tall oil and concentrated sulfuric acid at a molar ratio of 1:0.6, put tall oil into the reactor, add concentrated sulfuric acid dropwise while stirring, the reaction temperature is 45°C, the stirring speed is 500r / min, and the titration time is 1h , to obtain the intermediate product A.
[0060] (2) Put the product A into the reactor, titrate the alkali while stirring, the reaction temperature is 30° C., the stirring speed is 400 r / min, until the solution pH=9.5, stop the titration, and obtain the surfactant B.
[0061] (3) Stir and mix turpentine and acetic acid in a mass ratio of 1:0.2 to obtain a turpentine emulsion.
[0062] (4) Re...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com