Ecological rehabilitation method for contaminated soil in copper mining area
A technology for polluted soil and ecological restoration, applied in the restoration of polluted soil and other directions, can solve the problems of difficult to large-scale treatment of polluted soil, changes in soil physical and chemical properties, and low plant survival rate, so as to meet the normal needs of plant growth and solve the problem of The effect of dealing with problems and avoiding double pollution
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] A method for ecological restoration of abandoned soil in a mining area provided by an embodiment of the present invention comprises the following steps:
[0050] Step 1: Remove the large pumice stones on the soil surface of the polluted mining area, turn over the soil to be repaired, break it up and dry it, repeat 2 times.
[0051] Step 2: Add an appropriate amount of urban sludge to the soil in the mining area after drying, and after 20 days of stabilization, turn it over again, and design drainage ditches and sumps.
[0052] Step 3: Sow Commelina seeds or transplant Commelina seedlings on the stable mining soil to achieve vegetation restoration.
[0053] In the step 1 provided by the embodiment of the present invention, the depth of the soil in step 1 is 15 cm, crushed to a particle size of 2-3 cm, and aired for 4 days.
[0054] The dewatered sludge of the sewage plant provided in the embodiment of the present invention is directly applied to the soil in the mining a...
Embodiment 2
[0057] A method for ecological restoration of abandoned soil in a mining area provided by an embodiment of the present invention comprises the following steps:
[0058] Step 1: Remove the large pumice stones on the soil surface of the polluted mining area, turn over the soil to be repaired, break it up and dry it, and repeat 3 times.
[0059] Step 2: Add an appropriate amount of urban sludge to the soil in the mining area after drying, and after 30 days of stabilization, turn it over again, and design drainage ditches and sumps.
[0060] Step 3: Sow Commelina seeds or transplant Commelina seedlings on the stable mining soil to achieve vegetation restoration.
[0061] The soil provided by the embodiment of the present invention has a reconditioning depth of 30 cm, is crushed to a particle size of 3-4 cm, and is dried in the sun for 5 days.
[0062] The dewatered sludge of the sewage plant provided by the embodiment of the present invention is directly applied to the soil in th...
Embodiment 3
[0065] After 90 days of planting, commelina grew as well as figure 2 , (the figure only shows the first 30 days).
[0066] Harvest the aboveground part of Commelina chinensis, select part of it evenly, and measure its biomass, stem length and heavy metal content as follows:
[0067] Biomass (g / cm 2 )
[0068] It can be seen that the stubble part continues to grow and harvest, and such continuous extraction can effectively repair the heavy metal copper pollution in the soil of the mining area.
PUM
| Property | Measurement | Unit |
|---|---|---|
| Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


