Intermittent double-sludge denitrification AN (AO) n full-nitrification ultra-deep nitrogen and phosphorus removal process
A denitrification and double sludge technology, applied in water/sludge/sewage treatment, water pollutants, water/sewage treatment, etc., can solve problems such as unstable effluent water quality, and achieve the effect of improving the treatment effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] An intermittent double-sludge denitrification AN(AO)n full nitrification ultra-deep nitrogen and phosphorus removal process, the process includes a device part; the device part includes: a sewage storage tank 1, a denitrification tank 2, a nitrification tank 3, an intermediate Pool 4, flocculation and sedimentation tank 5;
[0048] The sewage storage tank 1 is connected to the first pipeline 6, the first pipeline 6 is provided with a water pump 7, the sewage storage tank 1 is connected to the denitrification tank 2 through the first pipeline 6, and the denitrification tank 2 is provided with a decanter 9, and the denitrification tank 2 The water outlet of the device 9 is connected to the second pipeline 8 and the third pipeline 10, the decanter 9 is connected to the nitrification tank 3 through the second pipeline 8, and the second pipeline 8 is provided with a supernatant liquid transfer pump 12 and a solenoid valve 13;
[0049] The decanter 9 is connected with the flo...
Embodiment 2
[0052] On the basis of Example 1, the bottom of the denitrification tank 2 and the nitrification tank 3 are provided with an aeration head 20, and the aeration head 20 is connected with the air intake pipe 17, and the air intake pipe 17 is provided with a gas flow meter 18, and the air intake pipe 17 Connect with the aeration pump 19, and the aeration pump 19 is connected with the frequency converter 25;
[0053] The top of the denitrification tank 2 is covered with a semi-sealed shape, and the top of the denitrification tank 2 is provided with an exhaust hole;
[0054] Both the bottom of the denitrification tank 2 and the nitrification tank 3 are provided with a first sludge discharge pipe 21, and a sludge discharge pump 22 is provided on the first sludge discharge pipe 21;
[0055] The bottom of the nitrification tank 3 is connected with the second mud discharge pipe 43, the nitrification tank 3 is connected with the denitrification tank 2 through the second mud discharge pi...
Embodiment 3
[0057] On the basis of Example 1-2, the upper part of the flocculation-settlement tank 5 is set as a cylinder and the lower part is set as a funnel-shaped cone with an angle of 45-70°, and the bottom of the flocculation-settlement tank 5 is provided with a third mud discharge pipe 23. The third row of mud pipes 23 is provided with a second mud discharge valve 24;
[0058] The flocculation settling tank 5 is connected with the phosphorus removal flocculant pipe 39 and the PAM flocculant pipe 27, the phosphorus removal flocculant pump 28 is arranged on the phosphorus removal flocculant pipe 39, and the PAM flocculant pipe pump 29 is arranged on the PAM flocculant pipe 27, and the flocculation The settling tank 5 is connected to the phosphorus-removing flocculant barrel 30 through the phosphorus removal flocculant pipe 39, and the flocculation settling tank 5 is connected to the PAM flocculant barrel 31 through the PAM flocculant pipe 27. The pipe 32 is provided with a drain valv...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com