A prefabricated component and prestressed technology, applied in excavation, manufacturing tools, infrastructure engineering, etc., can solve problems such as insufficient strength, uneven longitudinal force of support piles, unreasonable cross-sectional strength, etc., and achieve the appearance The effect of excellent quality, reliable performance and fast construction period
Inactive Publication Date: 2020-08-14
武汉市华江幸福装配式建筑有限公司
View PDF6 Cites 4 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
However, since the prestressed longitudinal reinforcement of this kind of member is full-length reinforcement and equal section strength at present, in the actual support project, the distribution of earth pressure changes along the depth of the foundation pit, and the general rule is along the upper part of the member length and The force on the lower part is relatively small, and the local force in the middle of the component reaches the maximum. For example, when using internal support or anchor rod, the bending moment and shear force of the support pile are much larger than other sections at the support point or anchor point. , the support piles are very unevenly stressed in the longitudinal direction, which brings about the irrationality of the current general reinforcement and equal section strength. That is to say, for the usual reinforcement members with equal section strength, only Local segment strength is fully utilized, while in most segments the strength is underutilized
In this way, if the reinforcement is reinforced according to the maximum force, it will cause waste and is not economical.
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Examples
Experimental program
Comparison scheme
Effect test
Embodiment Construction
[0025] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0026] A method for preparing prestressed prefabricated components, comprising the following steps,
[0027] 1) Make the original components: arrange and fix the longitudinal bars and stirrups according to the design to form a reinforcement cage, put them into the mold, place concrete in the mold, and form the original components after curing;
[0028] 2) Using structural glue, stick two groups of reinforcing parts longitudinally on the outside of the strength strengthening a...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more
PUM
Property
Measurement
Unit
compressive strength
aaaaa
aaaaa
shear strength
aaaaa
aaaaa
Login to view more
Abstract
The invention relates to the technical field of prestressed prefabricated components, and discloses a preparation method of a prestressed prefabricated component. The preparation method comprises thefollowing steps that when an original component is heated and cured, a curing system to control the time for standing, heating, constant temperature and cooling is formulated, standing is performed atnormal temperature for 2-6 hours, the difference value between the surface temperature of the prefabricated component discharged out of a pool and the environment temperature does not exceed 25 DEG C, the original component adopts a prefabricated component joint surface connected by post-poured concrete or mortar and grouting materials, and rough surface treatment is carried out according to design requirements during manufacturing. When the design has no specific requirements, the rough surface can be manufactured through chemical treatment, galling or chiseling and other methods, a sandwichexternal wallboard of the original component is suitable for being produced through a flat die technology, and during production, an external wallboard concrete layer needs to be poured firstly, thena heat preservation material and a pulling piece need to be installed, and finally an internal wallboard concrete layer needs to be poured; and when a vertical die technology is adopted for production, inner and outer wallboard concrete layers should be poured synchronously, and measures should be taken to ensure accurate positions of thermal insulation materials and tie pieces.
Description
technical field [0001] The invention relates to the technical field of prestressed prefabricated components, in particular to a preparation method of prestressed prefabricated components. Background technique [0002] There are many kinds of prefabricated component molds, common concrete component molds, component molds, hexagonal reservoir slope protection molds, bridge cover molds, urban road side stones, cement component molds, cement product component molds, concrete product molds, canal cover molds, Hollow hexagonal slope protection brick mold, road and bridge cover mold, cable groove cover mold, roadbed cover mold, electric power cover mold, water conservancy irrigation mold, plastic manhole cover mold, water conservancy cover mold, ditch cover mold, tunnel cover mold, Trench cover mold. [0003] At present, in the foundation pit support structure using prestressed prefabricated components, the commonly used components are: prestressed prefabricated pipe piles, prestr...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.