Transformer substation intelligent checking method and device based on whole-station IED simulation

A substation and calibration technology, applied in the direction of circuit devices, electrical components, electrical digital data processing, etc., can solve the problems of manpower and time consumption, lack of debugging tools, low degree of automation, etc.

Active Publication Date: 2020-08-25
DALI POWER SUPPLY BUREAU YUNNAN POWER GRID
View PDF6 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, the joint debugging of the control information of the existing telecontrol devices mainly relies on manual real-time communication between the master station and the factory station, that is, the information received by the master station and the information received by the master station are manually connected point by

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Transformer substation intelligent checking method and device based on whole-station IED simulation
  • Transformer substation intelligent checking method and device based on whole-station IED simulation
  • Transformer substation intelligent checking method and device based on whole-station IED simulation

Examples

Experimental program
Comparison scheme
Effect test

no. 1 example

[0023] figure 1 This is a schematic diagram of the structure of an electronic device provided by an embodiment of this application. In this application, figure 1 The schematic diagram shown is used to describe the electronic device 100 used to implement an example of an intelligent verification method and device for a substation based on a full-site IED simulation in an embodiment of the present application.

[0024] Such as figure 1 As shown in a schematic structural diagram of an electronic device, the electronic device 100 includes one or more processors 102, a storage controller 108, one or more storage devices 104, and an input device 106, and these components are interconnected through peripheral interfaces. It should be noted that figure 1 The components and structure of the electronic device 100 shown are only exemplary and not restrictive. The electronic device may have figure 1 Some of the components shown can also have figure 1 Other components and structures not shown. ...

no. 2 example

[0029] Reference figure 2 The flow chart of an intelligent verification method for substation based on IED simulation of the whole station is shown. The method specifically includes the following steps:

[0030] Step S201: Obtain the SCD file to which the entire station belongs.

[0031] Among them, SCD is the abbreviation of substation configuration description in the substation IEC61850 standard, that is, the whole station system configuration file.

[0032] Generally speaking, SCD files are pre-configured.

[0033] Step S202: Analyze all remote signaling signals in the full-site IED device model carried in the SCD file.

[0034] Among them, the SCD file is written in XML language.

[0035] As an implementation manner, step S202 includes: parsing all remote signaling signals in the full-site IED device model carried in the SCD file based on the Document Object Model (DOM).

[0036] In the above implementation process, through the DOM interface, the application can access any part of th...

no. 3 example

[0065] See image 3 An intelligent verification device for substations based on IED simulation of the whole station is shown, and the device 300 includes:

[0066] The obtaining module 310 is used to obtain the SCD file to which the entire station belongs.

[0067] The first parsing module 320 is used for parsing all remote signaling signals in the full-site IED device model carried by the SCD file.

[0068] The sending module 330 is used for sending each of the remote signaling signals to the remote control device by automatically turning and shifting each of the remote signaling signals in turn through the MMS protocol.

[0069] The receiving module 340 is configured to receive the IEC104 message returned by the remote control device based on the remote signaling signal.

[0070] The second parsing module 350 is configured to analyze the IEC104 message to obtain a forwarding table of the remote control device. The forwarding table includes an MMS sending record file, an IED104 messag...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The embodiment of the invention provides a transformer substation intelligent checking method and device based on whole-station IED simulation. The method comprises the steps of obtaining an SCD fileto which a whole station belongs; analyzing all remote signaling signals in the full-station IED device model carried by the SCD file; automatically turning and shifting each remote signaling signal in sequence through an MMS protocol to be sent to a telecontrol device; receiving an IEC104 message returned by the telecontrol device based on the remote signaling signal; analyzing the IEC104 messageto obtain a forwarding table of the telecontrol device; loading a regulation and control information table; and based on the regulation and control information table, an MMS sending record file, an IED 104 message receiving record file and a historical event record file, generating a telecontrol device check report. According to the method and the device, a manual checking mode in the prior art can be overcome, the labor cost is effectively saved, the checking time is shortened, the checking efficiency is improved, and the debugging period before transformer substation engineering commissioning can be effectively shortened.

Description

Technical field [0001] This application relates to the field of power grid application technology, and in particular to a method and device for substation intelligent verification based on IED simulation of the whole station. Background technique [0002] At present, conventional substation and intelligent substation monitoring systems need to collect a large amount of equipment operating status information, including primary equipment status data, secondary equipment status data and auxiliary equipment data. These data are sent to the station control layer equipment by means of MMS (Manufacturing Message Specification) messages at the equal interval layer IED (Intelligent Electronic Device) of the monitoring and control device of the protection device, such as monitoring host and remote control device. . The substation data communication gateway machine, that is, the remote control device, as an important station control level equipment, communicates with the lower level equipm...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): H02J13/00G06F30/367G06F113/04
CPCG06F30/367G06F2113/04H02J13/00001H02J13/00002H02J13/00028H02J13/00034Y02E60/00Y04S10/16Y04S10/18
Inventor 田皞张可马恩宁赵宇段晓雪杨凯江陆蔚琳李宏斌吴逍李杰杨洋
Owner DALI POWER SUPPLY BUREAU YUNNAN POWER GRID
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products