Method and system for comprehensively using steel smelting furnace slag resources, and blast furnace slag pot
A technology for iron and steel smelting and blast furnace slag, which is applied in the direction of recycling technology and process efficiency improvement. It can solve the problems of no follow-up process system, high phosphorus content in molten iron, poor applicability, etc., and achieve convenient follow-up processing procedures, efficient recycling, The effect of easy operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0066] use as figure 1 As shown in the process flow, the slag is proportionally: blast furnace slag: converter slag: desulfurization slag: refining slag = 2:3:0.5:0.4, liquid steel slag is mixed into the blast furnace slag pot containing molten blast furnace slag, and poured into it Added 85kg / t 高炉渣 Silica bricks; cover the blast furnace slag tank after feeding, and the tank cover is connected with a gas-compressed air burner; hoist the blast furnace slag tank into the insulation pit and cover it; mix the slag in the blast furnace slag tank through the burner The heating time is 40 minutes to ensure that the slag mixture is kept at 1150-1250 ° C for 2 hours; stop the heating, and after the modified slag is cooled slowly for 20 hours, lift the blast furnace slag pot and pour the modified slag into the slag At the same time, the dust removal device above the slag pit is opened; finally, the modified slag cooled to room temperature is crushed, screened and magnetically separated...
Embodiment 2
[0080] use as figure 1 As shown in the process flow, the above-mentioned slag is proportionally: blast furnace slag: converter slag: desulfurization slag: refining slag = 1:1:0.6:0.5, the liquid steel slag is mixed into the blast furnace slag tank filled with molten blast furnace slag, and Among them, 60kg / t is added 高炉渣 Clay bricks; cover the blast furnace slag tank after feeding, and the tank cover is connected with a gas-compressed air burner; hoist the blast furnace slag tank into the insulation pit and cover it; mix the slag in the blast furnace slag tank through the burner The heating time is 35 minutes to ensure that the slag mixture is kept at 1150-1250°C for 2 hours; stop the heating, and after the modified slag is cooled slowly for 22 hours, lift the blast furnace slag pot and pour the modified slag into the slag At the same time, the dust removal device above the slag pit is opened; finally, the modified slag cooled to room temperature is crushed, screened and magn...
Embodiment 3
[0094] use as figure 1 As shown in the process flow, the above-mentioned slag is proportionally: blast furnace slag: converter slag: desulfurization slag: refining slag = 3:1:0.3:0.2, the liquid steel slag is mixed into the blast furnace slag tank filled with molten blast furnace slag, and Among them, 50kg / t is added 高炉渣 high alumina bricks; after the feeding is completed, cover the blast furnace slag pot with a gas-compressed air burner; hoist the blast furnace slag pot into the insulation pit and cover it; use the burner to feed the slag in the blast furnace Add heat to the mixture, and the heating time is 30 minutes to ensure that the slag mixture is kept at 1150 ° C ~ 1250 ° C for 2.5 hours; stop the heat supplement, and after the modified slag is slowly cooled for 25 hours, lift the blast furnace slag tank and put the modified slag Pour into the slag pit, and at the same time open the dust removal device above the slag pit; finally, crush, screen and magnetically separat...