Rapid tunnel modeling method based on bim technology

A modeling method and tunnel technology, applied in the field of tunnel engineering BIM, can solve problems such as affecting work efficiency, and achieve the effect of improving work speed and modeling quality

Active Publication Date: 2022-06-24
SHANGHAI FOUND ENG GRP
View PDF5 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In actual engineering applications, engineering information is changing rapidly, and the maintenance and repeated revisions of BIM models are unavoidable
In the past, CAD modeling used fixed values ​​to define geometry. Each geometry has its fixed characteristics. If you want to modify it, you need to find its position and element information in the structure and redraw it. This repetition greatly affects work efficiency.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Rapid tunnel modeling method based on bim technology
  • Rapid tunnel modeling method based on bim technology
  • Rapid tunnel modeling method based on bim technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0048] The rapid tunnel modeling method based on BIM technology of the present invention takes a new large-scale river-crossing tunnel as an example: the maximum slope is 4.95%, and the minimum plane curvature radius is 750m; The slice thickness is 480mm and the width is 1500mm; the segment is divided into 8 pieces. ,

[0049] The method includes the following steps:

[0050] (1) Create the tunnel skeleton line, that is, the design axis of the tunnel center: project the center of the longitudinal plane to the xy plane (ground elevation) according to the normal direction, and define the curve parameters contained in the projection line of the generated longitudinal center line through the rule curve command. The point coordinates of the projection line, and the law curve that is at the same ground level as the center line of the tunnel plane is obtained. When the conditions are met, use the sweep command to set the guide line as the plane centerline, refer to the surface xy p...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a rapid tunnel modeling method based on BIM technology, which is used for shield construction design. The steps are: 1) Create the tunnel skeleton line, that is, the central design axis of the tunnel; 2) Generate the lining ring UDF and the central axis; 3) )Create a "skeleton-driven parameterization" tunnel model: define a list for recording the center point and center axis that are consistent with the input conditions of the lining ring UDF, and use knowledge engineering sentences, 4) Select the tunnel model features and associated parameters , to generate a super copy of the tunnel, the condition is the centerline of the horizontal and longitudinal sections of the tunnel: just import or draw any centerline of the horizontal and longitudinal sections of the tunnel, and apply the super copy of the tunnel to realize the rapid generation of the tunnel model. In shield tunneling construction, with the progress of progress and the deepening of construction, the working conditions are constantly changing. By modifying the key parameter dimensions, the design results consistent with the actual engineering requirements can be obtained, which can greatly improve the working speed and modeling. quality.

Description

technical field [0001] The invention relates to a tunnel engineering BIM technology, in particular to a method for rapidly establishing a shield tunnel by parameterization of a "skeleton-driven model". Background technique [0002] Municipal engineering has its unique professional fields, including: geographic information, engineering geology, lines, roadbeds, bridges, tunnels, electromechanical and so on. The introduction of BIM technology has been promoted and applied. Among them, CATIA is developed by the French Dassault Company and is the world's leading CAD / CAE / CAM integrated software. It covers the whole process of engineering design, product design, 3D modeling, stress analysis, simulation, engineering drawing generation to blanking and processing, and is widely used in automobile manufacturing, aerospace, shipbuilding, plant design, power and electronics, Consumer goods and general machinery manufacturing industries. The BIM working environment of CATIA concurrent...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06F30/13G06F30/20G06F111/10G06F111/20
CPCG06F30/13G06F30/20G06F2111/10G06F2111/20
Inventor 林佳晨陆正李峰易宏
Owner SHANGHAI FOUND ENG GRP