Fixed installation mode of insulating plate of low-temperature thin-film land storage tank for liquefied natural gas storage
A technology of liquefied natural gas and installation method, which is applied to the installation device of container structure, gas/liquid distribution and storage, container discharge method, etc. It can solve the problems of destroying the integrity of the moisture-proof isolation layer, etc., so as to save workload and shorten construction cycle, the effect of improving safety and environmental protection
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0030] As a preferred embodiment of the present invention, the surface of the embedded metal plate 2 is welded with an insulating plate to fix studs 4, and the studs are selected from M8-M16, and each embedded metal plate 2 is welded with 6-12 studs for Fix the thermal insulation board 5.
[0031] As a preferred embodiment of the present invention, the back of the thermal insulation board 5 is leveled with the concrete outer tank and the bottom plate 1 by coating resin glue, and the coating thickness of the resin glue is 3-50mm.
[0032] As a preferred embodiment of the present invention, the said pre-embedded metal plate 2 should undergo a corresponding tensile test in the concrete outer tank and the bottom plate 1 .
[0033] As a preferred embodiment of the present invention, the insulating plate fixing stud 4 is fixed on the embedded metal plate 2 by resistance welding or manual welding, and the fixing method should be subjected to a corresponding tensile test.
[0034] Th...
Embodiment 1
[0037] Concrete outer tank and bottom plate 1 need to build construction platform scaffolding design: in the process of construction, it is necessary to design a complete set of modular scaffolding, and provide corresponding working platforms and storage platforms, and the strength and safety performance of the design are balanced. Specification requirements must be met.
[0038]Before pouring the concrete outer tank and the bottom plate 1, it is necessary to fix the pre-embedded metal plate 2, fix it in the concrete steel skeleton, fix the anchor bolt 3 on one side of the concrete, and make sure that the side of the plate is flush with the inner wall of the tank. The levelness and verticality meet certain requirements, and the allowable deviation of the basic positioning cannot exceed ±20mm. After the measurement and inspection, the pouring of the outer concrete tank and the bottom plate can be carried out.
Embodiment 2
[0040] The installation of the moisture-proof isolation layer 6: in consideration of keeping the interlayer airtight, preventing gas outside the tank from entering the space of the insulation layer of the inner tank, and at the same time, after LNG leaks into the insulation layer of the inner tank of the film, it can isolate and prevent it from leaking to the outside through the concrete, It is necessary to install the moisture-proof isolation layer 6 after the concrete outer tank and the inner wall of the bottom plate 1 are completed. Considering the airtightness of the embedded metal plate 2, the concrete outer tank and the inner wall of the bottom plate 1, the coating of the moisture-proof isolation layer should be carried out after the fixing studs 4 are installed.
[0041] The moisture-proof isolation layer 6 can be sprayed with epoxy glue, and an adhesion test is required to ensure that the glue is complete and does not fall off, and has reliable airtightness. Or you can...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| width | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |