Composite tube plate, air cooler tube bundle and preparation process
A preparation process and a technology for composite pipes, applied in the field of air coolers, can solve problems such as poor welding quality, peeling off of steel and aluminum, and fracture, and achieve the effect of overcoming cracking and improving welding quality.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0106] Substrate preparation: According to the design and calculation conditions, the material is selected as Q235B, and the thickness is 18mm. The material is cut by punching and shearing, and the surrounding edges are deburred, smoothed and blunt.
[0107] Preparation of the second groove: one row in parallel is located at the preset tube hole position of the tube plate, the depth is 4mm, the shape is flat, the size is 238×38mm, and the bottom surface and side surface of the second groove are controlled by CNC drilling and milling. The angle between them is 75 degrees, and a sealing groove with a triangular cross-section is opened on the side of the second groove.
[0108] Preparation of filler for welding: the material is aluminum alloy 3003. Firstly, a plate with a thickness of 4.98 mm is punched into a filler for welding with a mold, and the shape corresponds to the second groove.
[0109] Welding part and tube hole preparation: place the welding filler obtained in the pr...
Embodiment 2
[0112] Substrate preparation: According to the design and calculation conditions, the material is selected as Q345R, the thickness is 26mm, and the material is cut by laser cutting. The surrounding edges are deburred, smoothed and blunt.
[0113] Preparation of the second groove: the same as the preparation process provided in Example 1, except that the depth is controlled to be 5mm, the size is 248×38mm, and the angle between the bottom surface and the side of the second groove is controlled to be 77 degrees, and A trapezoidal sealing groove is provided on the side of the second groove.
[0114] Preparation of filler for welding: the material is aluminum alloy 3003. Firstly, a plate with a thickness of 6.27mm is punched into a filler for welding with a mold, and the shape corresponds to the second groove.
[0115] Welding part and tube hole preparation: place the welding filler obtained in the previous step in the second groove, deform it by forging and insert it in the secon...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Depth | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


