A technology for desulfurization wastewater and treatment equipment, which is applied in the direction of gaseous effluent wastewater treatment, water/sewage treatment, water treatment parameter control, etc. It can solve problems such as insufficient, dynamic adjustment, and non-energy-saving stirring of accelerated mixing and stirring devices, and achieve Effects of reducing cylinder load, accelerating condensation reaction, and increasing reaction speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0037] Such as Figure 1-6 As shown, the embodiment of the present invention provides treatment equipment for desulfurization wastewater in power plants, including a pretreatment box 1, a waste water inlet pipe 8 is fixedly connected to the left side of the pretreatment box 1, and the side of the pretreatment box 1 away from the waste water inlet pipe 8 is fixedly connected in sequence There are a neutralization tank 3, a sedimentation tank 4, a flocculation tank 5, and a clarification tank 6. The first connecting pipe 11 is fixedly connected between the pretreatment tank 1 and the neutralization tank 3, and the neutralization tank 3 and the sedimentation tank 4 are fixedly connected. There is a third connecting pipe 13, a fourth connecting pipe 14 is fixedly connected between the sedimentation tank 4 and the flocculation tank 5, a fifth connecting pipe 15 is fixedly connected between the flocculation tank 5 and the clarification tank 6, and the side wall of the neutralization ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 