A construction method and technology on the construction site, applied to floors, coverings/linings, buildings, etc., can solve problems such as long construction period, reduced service life, water seepage of external walls and thermal insulation materials, etc., to achieve convenient construction, shorten construction period, The effect of improving the waterproof and thermal insulation performance of the external wall
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0024] This embodiment discloses a construction method for construction site decoration, including:
[0025] (1) Clean up the grassroots
[0026] Clean up the floating ash and stains on the base wall, remove protrusions, hollows, and loose parts, and wet the base wall twice;
[0027] (2) Base coating
[0028] Spread the mortar evenly on the surface of the base layer for plastering treatment, apply it twice, each time with a thickness of 0.8mm, and polish the plaster layer after drying, apply adhesive on one side of the glass fiber mesh cloth, and apply the adhesive on the side of the glass fiber mesh. The fiber mesh cloth is pasted on the plastering layer, and multiple vertical keels are fixed at equal intervals by expansion bolts;
[0029] (3) Coating again
[0030] Apply a layer of inorganic thermal insulation mortar on the glass fiber mesh cloth between the vertical keels, then brush the interface agent and water repellent on the vitrified microbead thermal insulation mo...
Embodiment 2
[0037] On the basis of Embodiment 1, a construction site decoration construction method disclosed in this embodiment includes:
[0038] (1) Clean the base: clean the floating ash and stains on the wall of the base, remove protrusions, hollows, and loose parts, and wet the wall of the base for 3 times;
[0039] (2) Base treatment: first hang a layer of barbed wire on the surface of the base, then evenly apply a layer of anti-cracking mortar, and then evenly brush the mortar for plastering treatment, apply three times, each time within 0.5mm thickness, plaster After the layer is dry, it is polished and smoothed, and adhesive is coated on one side of the glass fiber mesh cloth, and the glass fiber mesh cloth on the side coated with the adhesive is pasted on the plastering layer, and multiple vertical keels are fixed at equal intervals by expansion bolts;
[0040] (3) Brushing again: Apply a layer of inorganic thermal insulation mortar layer on the glass fiber mesh cloth between t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com