Densification controllable casting construction process

A construction technology, compaction grouting technology, applied in basic structure engineering, construction, sheet pile wall and other directions, can solve the problems of limitation, inability to enter the predetermined reinforcement range, loss of advantages and status, etc., to achieve highly targeted Effect

Inactive Publication Date: 2005-04-20
SHANGHAI TUNNEL ENGINEERING CO. LTD.
View PDF0 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the current grouting equipment, materials and detection methods limit the overall development of this process. With the rise of other foundation reinforcement processes, the foundation grouting reinforcement process has gradually lost its advantages and status.
Through literature search, it is found that "Civil Engineering Grouting Construction and Effect Detection" edited by Cheng Xiao and Zhang Fengxiang, Tongji University Press, January 1998, page 17, this article mentions the most used double drill pipe filter tube technology and For the two-layer pipe and double plugging process, the more prominent problem is that the grout cannot accurately enter the predetermined reinforcement range according to the design requirements, which makes the reliability and confidence of the grouting questionable
In addition, the limitations of grouting effect detection and measurement technology and the after-the-fact nature are also the main reasons for the stagnant development of grouting reinforcement technology.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] Taking the reinforcement construction technology of a subway station foundation pit as an example, the foundation pit is 268m long, 14.6m wide, has two floors underground, and has a buried depth of 15m. It adopts a double-layer and two-span structure. The enclosure structure adopts reinforced concrete underground diaphragm wall structure, with a buried depth of 28m. The excavation depth of the west end head well of the foundation pit is 14.57m, the excavation depth of the middle part is 12.72m, and the excavation depth of the east end head well is 14.47m. The bottom of the foundation pit is in gray silty clay and gray clay.

[0027] In order to improve the soil strength and subgrade coefficient at the bottom of the foundation pit, enhance the stability of the toe at the bottom of the pit and the rigidity of the enclosure structure, and reduce the deformation of the enclosure of the foundation pit and the deformation of the soil outside the pit, CCG is used to control th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A controllable compaction grouting construction process belongs to the field of construction engineering. The specific process is as follows: the reinforcement design requirements are provided to the command and control system, the material ratio, the depth of the drilled pipe, the height of the pipe removal, the grouting pressure and the flow rate are determined. Then carry out the command and control of grout mixing, conveying, grouting, drilling, pipe embedding, and extubation; the grouting material feeding system performs the grouting material mixing process; the feeding and conveying system transports the mixed materials to the grouting system; The grouting system carries out the material pressure injection process; the drilling, pipe-burying and pipe-extraction system carries out the pipe-extraction process during the drilling, pipe-burying and grouting process; the reinforcement effect detection system monitors the grouting process and the effect after grouting reinforcement Detection process. The invention has strong pertinence, is applicable to different weak foundation reinforcement, deviation correction and foundation underpinning, is perfected on the basis of the original foundation compaction grouting reinforcement, and solves the deficiency and defect of the original construction technology.

Description

technical field [0001] The invention relates to a foundation grouting construction technology, in particular to a controllable compaction grouting construction technology, which belongs to the field of construction engineering. Background technique [0002] The foundation grouting reinforcement technology has the advantages of small investment scale, simple construction equipment, small construction area, small impact on traffic and environment, and easy control of reinforcement depth. It is widely used in mines and other underground construction fields. Especially in the foundation reinforcement engineering of urban deep underground engineering, the correction of urban housing structure and underground boring machine construction, etc., this process has unique advantages. However, the current grouting equipment, materials and detection methods limit the overall development of this process. With the rise of other foundation reinforcement processes, the foundation grouting r...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D5/34E02D5/62E02D15/02
Inventor 张冠军程骁谢彬黄均龙李向红
Owner SHANGHAI TUNNEL ENGINEERING CO. LTD.