Treatment method of newly built high way railway engineering soft foundation
A technology of weak foundation and treatment method, applied in the direction of infrastructure engineering, roads, roads, etc., can solve the problems of environmental damage, high cost, slow progress, etc., and achieve the effect of increasing stability, low cost, and improving bearing capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0015] The soft foundation treatment method of new highway and railway engineering of the present invention, this method is through the following steps on the surface of the soft foundation to squeeze the ooze away to form a hard shell replacement layer: a, equipped with filling stones with a maximum particle diameter of no more than 60cm; b, on the soft foundation surface The surface of the foundation is covered with a 40-80cm thick stone layer; c. Use the rammer to drop the ramming hammer, and use the ramming force of the ramming hammer to arrange the ramming points in the way of point ramming or interval ramming and supplementary ramming to ram the stone layer. The selected ramming point is rammed into a ramming pit of 2-3m; d. For each ramming pit, press filler-ramping, filler-ramming until the settlement of 2-3 consecutive rammings is less than 7cm, Ramming can be stopped. The stone is Kaishan stone, and the unconfined compressive strength of the stone is not less than 15...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com