Construction method for large scale high-performance cement concrete road panel
A technology of cement concrete and construction methods, which can be applied to cohesive pavement paved on site, roads, roads, etc., which can solve the problems of concrete pavement slab fracture, fracture, pavement concrete fracture, etc., to reduce daily maintenance costs and reduce damage chance, the effect of prolonging the service life
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0029] Embodiment 1: In this embodiment, the horizontal dimension of the concrete slab of the road surface is set at 6 meters, and the longitudinal dimension is set at 10 meters;
[0030] 1. The requirements for various materials in concrete are as follows
[0031] The cement uses ordinary Portland cement. Tricalcium aluminate (C 3 A) content (C in cement clinker 3 The content of A) is controlled within 5%, tetracalcium iron aluminate (C 4 AF) content (C in cement clinker 4 The AF content) is greater than 16%, the alkali content is less than 0.6%, and the cement factory temperature is lower than 60°C. The other standards should meet the requirements of Portland cement and ordinary Portland cement technical requirements (GB175-92).
[0032] The crushed stone shall meet the requirements of JGJ53-1992 crushed stone quality standard for ordinary concrete, the alkali aggregate reaction shall be evaluated, and non-alkali active materials shall be selected.
[0033] The medium-coarse san...
Embodiment approach
[0039] (1) First, handle the base layer. The base layer should be lime limestone base layer, that is, cement, fly ash, and crushed stone are used as the base layer, and the cement, fly ash, and crushed stone used should meet the requirements and standards described above. The basic level should meet the following indicators:
[0040] ①Compact degree ≥97%;
[0041] ②Flatness ≤10mm;
[0042] ③The elevation is -10mm~+5mm;
[0043] ④The error of road surface thickness is ±10%;
[0044] ⑤ 7d unconfined compressive strength ≥3.0MPa;
[0045]⑥The width is not less than the design value;
[0046] ⑦The composite elastic modulus of the top surface of the base layer is ≥120MPa;
[0047] ⑧There are no big cracks or breaks. If there are big cracks or breaks, asphalt felt should be used for treatment to avoid reflection cracks.
[0048] 2. Lay out sample piles and pop up the ink line on the completed base layer;
[0049] 3. Support the template according to the sample pile and ink line:
[0050...
Embodiment 2
[0085] Embodiment 2: In this embodiment, the horizontal dimension of the pavement concrete slab is 5 meters, and the longitudinal dimension is 8 meters;
[0086] Concrete mix ratio such as Table 1b
[0087] Table 1b
[0088] Mixing ratio (Kg)
[0089] The selection criteria of the materials are the same as in Example 1. In this example, the construction temperature is 10-20℃, and the allowable maximum time for the concrete mixture from the mixer to paving, vibrating, and working (not including napping) is For 90 minutes, when the wind speed is 16Km / h, the difference between the concrete temperature and the atmospheric temperature is 5.6℃, and the evaporation rate is limited to 0.5Kg / m 2 ·When h, the relative humidity is 80%, and the limit temperature of concrete plastic shrinkage and cracking is 37.8℃. The three-pass screed method is used when the slurry is lifted and the surface is applied. , Other practical methods and conditions are the same as in Example 1.
PUM
| Property | Measurement | Unit |
|---|---|---|
| surface smoothness | aaaaa | aaaaa |
| compressive strength | aaaaa | aaaaa |
| size | aaaaa | aaaaa |