Tunneling construction method of fully mechanized tunnelling machine for weak-cementation eugeogenous rock dip drift
A construction method and weak cementation technology, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve problems such as poor control of the head of fully mechanized excavators
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2009-06-24
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1
Abstract
Description
technical field
[0001] The invention relates to a fully mechanized excavator tunneling construction technology for inclined roadways in weakly cemented and easily weathered soft rocks, which is used for tunneling in various weakly cemented and easily weathered inclined soft rock roadways. Background technique
[0002] At present, coal mine roadway excavation is divided into two methods: comprehensive excavation method and drilling and blasting method. The drill and blast method is mainly used for tunneling in hard rocks; the fully mechanized tunneling method is generally only used for tunneling in coal and semi-coal rocks. For the inclined roadway of weakly cemented and easily weathered soft rock mass with low strength, poor cementation, easy weathering and disintegration when exposed to water and air, and the strength is close to that of soil, the existing tunneling construction technology adopts the drilling and blasting method, but due to the surrounding The rock is brok...
Examples
Embodiment Construction
[0012] The gray-green sandstone or coarse sandstone exposed in the horseshoe-shaped roadway (-5.5°) of the auxiliary inclined shaft of Gaojialiang Coal Mine belongs to Jurassic argillaceous cementation, with low strength and uniaxial compressive strength of only 1.3MPa. 1. It is easy to weather and disintegrate after being exposed to air. After weathering, its strength is close to that of soil. The natural moisture content is 9.35-10.42%, with an average of 9.992%. The content of montmorillonite is 17.8%, and the free expansion rate is 13%.
[0013] The specific construction method is:
[0014] Before excavation, lay the pipe shed as advance support. Pipe shed specifications: diameter 45mm, length: 2500mm. Spacing 300mm, pipe shed overlapping length about 1000mm. Under the protection of the advanced support of the pipe shed, the EBZ(JA)-150 fully mechanized excavator is used for cutting. When cutting, determine the excavation profile according to the design width and height,...