Restoration construction method for in-service oil gas pipeline which encounters with collapse and destruction of worked-out section
A technology for oil and gas pipelines and construction methods, applied in pipeline systems, pipeline laying and maintenance, and pipe components, etc., can solve problems such as endangering pipeline safety, pipeline subsidence, and surface subsidence, and achieve the effect of reducing risks.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0119] Embodiment. With this example, it is the test method to the gob control project of the Haoyu village coal mine of the West-to-East Gas Transmission Project. The length of the lifting pipe is 466m, and the maximum height of the lifting is 1.35m. Its flow process is as follows figure 1 shown.
[0120] The technological process of the pipe lifting construction method is as follows:
[0121] 1. Construction preparation;
[0122] 1.1 Various technical parameters of the pipeline body;
[0123] The parameters of the hoisted pipeline itself are:
[0124] outer diameter
wall thickness
Weight per linear meter
1016mm
17.5mm
430.93kg / m
[0125] 1.2 Materials
[0126] The main materials of this project include medium and coarse sand, straw bags, thermal insulation quilts, sleepers, etc. The specific plan is shown in the table
[0127] Main material demand schedule
[0128] serial number
unit
Specificatio...
PUM