Multi-parameter fused substation data integrity checking method
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- CHINA ELECTRIC POWER RES INST
- Publication Date
- 2012-11-28
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of electric power system automation, and in particular relates to a multi-parameter fusion substation data integrity checking method. Background technique
[0002] At present, the degree of informatization of substations has been greatly improved. Data collection and interactive sharing are no longer the bottleneck of the development of substation automation technology, but data quality has gradually become the focus of engineering technology and operation and maintenance personnel.
[0003] In fact, master stations such as power dispatching have long used state estimation to check the state data of the power system. Due to channel limitations, the amount of substation data transmitted to the main station is limited, so the unknown or suspicious quantities can only be estimated through power flow calculations based on known quantities, that is, state estimation. Insufficient basic data and large amount of c...