Sealability testing method of insulation valve of separating piece of cooling water system of main pump of nuclear power station
A technology of cooling water system and test method, which is applied in the field of nuclear power plant detection, can solve the problems of high exposure level of test personnel, contamination of personnel and equipment, and scattered system equipment, so as to reduce radiation risk and industrial safety risk, and reduce plugging and unplugging The number of joints and the effect of creating economic benefits
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] According to the structure of the cooling water system of the main pump of the existing nuclear power plant, it can be seen that the penetrating parts form a circulation loop in pairs, and the schematic diagram of the structure is as follows figure 1 as shown, figure 1 Among them, both the first penetrating piece 201 and the second penetrating piece 202 are installed on the containment vessel 6, the first penetrating piece 201 is provided with an eighth valve 002, a tenth valve 003 and an eleventh valve 001, and the tenth valve 003 is provided with The third joint 3, and the eleventh valve 001 is set outside the containment, the eighth valve 002 and the tenth valve 003 are set inside the containment; the second penetration 202 is set with the sixth valve 023, the seventh valve 007 and the valve Group 005, the sixth valve 023 is provided with the first joint 1, and the seventh valve 007 is arranged outside the containment, and the sixth valve 023 and the valve group 005 ...
Embodiment 2
[0056] Embodiment 2 is a further optimization of Embodiment 1, that is, by plugging and unplugging the joint of the test equipment once, after detecting the tightness of the sixth valve, the seventh valve and the eighth valve, the tenth valve and the eleventh valve can be further tested. The tightness of valves and valve groups, specifically, after the step (c) is completed, the steps are: close the tenth valve 003, open the eighth valve 002, pressurize the third joint 3 through the test equipment for testing, pass The reading of the flowmeter on the test equipment detects the tightness of the tenth valve 003. If the reading of the flowmeter is zero, the sealing of the tenth valve 003 is intact; if the reading of the flowmeter is not zero, then there is leakage in the tenth valve 003; then , open the tenth valve 003, close the eleventh valve 001 and valve group 005, continue the pressure test at the third joint 3 through the test equipment, and detect the eleventh valve 001 and...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 